Date Asked: 10/25/2017 Date Answered: 10/27/2017
Poster: Tracy Dusablon Company: Aetna Bridge Company
Question:
Regarding Item 800.9901, there are only four bridges listed in the distribution of quantities that would need platforms. However, there are other bridges that will require temporary platforms to complete the work. Page CS-8 states that work at bridges 138, 150, 161, 199, 225, and 271 shall be conducted from the bridge deck or via scaffolding or floating barges…” How will these working platforms be paid?
Answer:
Reference to Bridge 138 should be Bridge 136; this will be corrected by Addendum No. 3. Bridge No. 136 will not require a work platform since there are not repairs required inside the culvert. The DOQ includes quantity for Bridge No. 199. Quantities for work platforms on Bridges 26, 27, 28, and 199 assumes a work platform that extends the full deck area of the bridge plus five (5) feet beyond each fascia. Quantities for work platforms will be added for Bridges 150, 161, 225 and 271 by Addendum No. 3. Quantities for work platforms on Bridges 150, 161, 225 and 271 assumes a work platform is needed for 50% of the deck area. The payment for this item shall be based on the actual work platform installed at each bridge as required to perform the repairs at each bridge as approved by the Engineer.
Date Asked: 10/25/2017 Date Answered: 10/26/2017
Poster: Tracy Dusablon Company: Aetna Bridge Company
Question:
See Sheet 131. 1.) Please clarify how the grinding for the “Collision Damage Repair Detail” work is paid; 2.) Please clarify the cleaning & painting limits for this repair; 3) Please clarify how the cleaning and painting is paid.
Answer:
1) The collision damage repair is shown to be performed by grinding methods. The collision damage repair work shall be included in the Item Code 825.8025 “Surface Preparation to SSPC-PC6 Standards” 2) The cleaning and painting limit is represented by the dark dash lines in the detail. The length and height dimension criteria are given in the detail. 3) Cleaning and painting of repaired areas shall be paid for under Item Code 825.8025 “Surface Preparation to SSPC-PC6 Standards”. and Item Code 825.8040 "Painting Existing Structural Steel"
Date Asked: 10/20/2017 Date Answered: 10/26/2017
Poster: Tracy Dusablon Company: Aetna Bridge Company
Question:
Item 817.9901 Concrete Grout Filled Fabric Bags states that the work is “to be accomplished underwater to fill voids or create underwater forms under bridge piers or bridge abutments. The use of certified divers shall be required.” Item 817.9902 requires cementitious grout for underwater repairs. However, the contract also includes pay items for “Dewatering”, “Dewatering Basins” and “Sand Bag Erosion Dike” at these locations. Is the intent of the contract to perform Items 817.9901 and 817.9902 in the dry or wet? Will the dewatering, dewatering basins, and sand bag erosion dike be mandatory?
Answer:
The specification has been updated by Addendum No. 2. The work of Item 817.9901 may be accomplished underwater or in the dry to fill voids or create forms under bridge abutments The cementitious grout for underwater locations shall be performed in the dry.
Date Asked: 10/20/2017 Date Answered: 10/26/2017
Poster: Tracy Dusablon Company: Aetna Bridge Company
Question:
How were the quantities for Item 800.9901 calculated? What are the vertical and horizontal pay limits?
Answer:
The assumed horizontal area of the work platform for Item Code 800.9901 has been updated by Addendum No. 2 to include the full deck area of the bridge. Any vertical portions of the work platform are incidental to the costs of the platform.
Date Asked: 10/19/2017 Date Answered: 10/26/2017
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
PLEASE CLARIFY HOW THE PROPOSED BACKWALL AND BRIDGE SIDEWALK LOCATED AT THE STRIP SEAL JOINT IS PAID FOR.
Answer:
The joint block out concrete at the bridge deck, backwall and sidewalk shall be included under 808.1501 Concrete Superstructure Class HP ¾” Bridge Decks.
Date Asked: 10/19/2017 Date Answered: 10/26/2017
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
THERE IS NO AMTRAK SPECIFICATION INCLUDED IN THE CS PAGES AS STATED ON THE CONTRACT PLANS.
Answer:
Note 21 on Sheet 9 will be removed via upcoming addendum. Amtrak agreement is still pending.
Date Asked: 10/19/2017 Date Answered: 10/26/2017
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
SHEET 40, PLEASE CALRIFY HOW THE REMOVAL AND REPLACEMENT OF THE BRIDGE SIDEWALK IS PAID FOR.
Answer:
Removal of the sidewalk is paid for under Item code 201.0403 Remove and Dispose Sidewalks. Replacement is paid for under 601.0200 Class XX Portland Cement Concrete. See detail on Sheet 41.
Date Asked: 10/19/2017 Date Answered: 10/26/2017
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
SHEET 28, PLEASE CLARIFY HOW THE PROPOSED CONCRETE ENCASEMENT IS PAID FOR.
Answer:
The southwest hand rail concrete encasement activity is included under Item 601.0200 Class XX Portland Cement Concrete and 819.0800 Drill and Grout Reinforcing Dowels.
Date Asked: 10/19/2017 Date Answered: 10/26/2017
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
PLEASE CLARIFY HOW THE TEMPORARY HANGER AND NEW HANGER FOR THE GAS LINE AT BRIDGE 26 RE PAID FOR.
Answer:
Except for the ¾” adhesive anchor and angle shown in Detail 1 on Sheet 20 which is to be supplied by and installed by the contractor, all material for temporary and permanent supports shall be supplied by NGrid and installed by an approved NGRID subcontractor. All costs for this work shall be paid under Item 808.9901, Bridge Fiber Wrap Floor Beam, which includes the NGrid approved contractor’s work.
Date Asked: 10/19/2017 Date Answered: 10/26/2017
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
PLAEASE CLARIFY HOW THE SURFACE PREP AND PAITING FOR ITEM NOS. 824.9901 AND 824.9902 IS PAID FOR.
Answer:
Surface prep of repaired areas shall be paid for under 825.8025 “Surface Preparation to SSPC-PC6 Standards”. Painting of repaired areas shall be paid for under 825.8040 "Painting Existing Structural Steel"
Date Asked: 10/19/2017 Date Answered: 10/26/2017
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
PLEASE CLARIFY HOW THE SURFACE PREP AND PAINTING FOR 825.9901 & 825.9902 IS PAID FOR.
Answer:
Surface prep of repaired areas shall be paid for under 825.8025 “Surface Preparation to SSPC-PC6 Standards”. Painting of repaired areas shall be paid for under 825.8040 "Painting Existing Structural Steel"
Date Asked: 10/10/2017 Date Answered: 10/19/2017
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
DUE TO ALL THE PROJECTS BIDDING, PLEASE CONSIDER POSTPONING THE BID BY TWO TO THREE WEEKS.
Answer:
The bid will be postponed via forthcoming Addendum to November 3, 2017 at 1:00pm.