Questions and Answers For:

Trestle Trail - West Section Bridges 2017-CB-073

Please Note: If this is the first time accessing our system on our new web site, you will be required to reset your password.

The ask question function is now disabled;
please call 401-222-2492 x 4100 with any new questions.

Date Asked: 03/12/2018 Date Answered: 03/12/2018
Poster: Joseph Godino Company: John Rocchio Corporation
Question:
Is restoration of the existing grades required along the access paths or only re-vegetation work?
Answer:
Restoration of the existing grades along the access paths is not required except at specific locations noted on the plans.
Date Asked: 03/09/2018 Date Answered: 03/12/2018
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
The specification state that all excavated soils shall be disposed of offsite at an appropriately licensed disposal facility. The department should include an allowance item for the disposal fees.
Answer:
Sheet C6, Trail Surface Restoration Detail, Note 3, states that the costs for disposal of additional material from the embankment removal not utilized for trail surface restoration shall be included in the contractor’s bid price. Some calculation is needed to determine the quantity to be removed from the site. During Design 25,000 CY (max) of material was estimated to be excavated out from the embankment and about 7,500 CY of material will be reused for the trail resurfacing (~30% will be resurfacing material and ~70% will have to be disposed).
Date Asked: 03/09/2018 Date Answered: 03/12/2018
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Sheet 10 of the Drawings states that no regarding or tree trimming is required for the 7800 lf of the trail from plainfield pike. Drawing C6 states that surface restoration is required for this area. Please clarify.
Answer:
Drawing 6 shall govern.
Date Asked: 03/06/2018 Date Answered: 03/12/2018
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
ONCE SAND BAGS ARE INSTALLED, CAN DEBRIS FALL BEHIND THE SAND DIKE SYSTEM WHILE DEMOLISHING THE CONCRETE AT THE PIERS.
Answer:
During demolition, debris is allowed to fall inside the sand bag enclosure. This debris must be removed and properly disposed of prior to the removal of the sand bag dike system.
Date Asked: 03/06/2018 Date Answered: 03/12/2018
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
DOES THE CONTRACTOR HAVE AN OPTION TO CAST THE DECK IN PLACE IN LIEU OF DECK PANELS?
Answer:
No.
Date Asked: 03/06/2018 Date Answered: 03/12/2018
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
ITEM CODE 809.9900 AND 809.9901 MENTIONS POST TENSIONING OF THE PRECAST SLABS. PLEASE CLARIFY IF THE PANELS ARE POST TENSIONED.
Answer:
Post tensioning is required in the longitudinal direction at two locations. Two Longitudinal ties, one above each girder located at the mid hight of the deck section is required.
Date Asked: 03/06/2018 Date Answered: 03/12/2018
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
PLEASE CLARIFY HOW THE EPOXY MORTAR UNDER THE DECK PANELS IS PLACED BEFORE OR AFTER THE PANELS ARE INSTALLED.
Answer:
The epoxy mortar under the panel is intended as a leveling pad. The contractor has the choice of placing it before or after the panels are installed.
Date Asked: 03/06/2018 Date Answered: 03/12/2018
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
PLEASE PROVIDE INFO OR MAP ON HOW TO ACCESS THE TRESTLE TRAIL NEAR CARBUNGLE POND.
Answer:
Access to this area is from Route 14A in CT and is indicated on the Key Plan.
Date Asked: 03/06/2018 Date Answered: 03/12/2018
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
ITEM NO. 817.9900 AND 817.9901. THE SPECS SAYIT IS PAID BY THE SF AND THE PROPOSAL PAGES INDICATE BY THE CF. PLEASE CLARIFY. ALSO PLEASE CLARIFY IF THE 3" OF CONCRETE IS ADDED TO THE ENTIRE FACES OF THE PIERS.
Answer:
Item Nos. 817.9900 and 817.9901 are to be paid by the SF. This will be corrected by addendum. All repairs shall be in accordance with the contract plans, please clarify where the 3-inch reference came from.
Date Asked: 03/06/2018 Date Answered: 03/12/2018
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Item No. 201.9903 - this item is not included in the special provisions. Please provide one to indicate what is included in the item.
Answer:
All requirements for this item of work are indicated on the Trestle Trail Improvement Plans
Date Asked: 03/02/2018 Date Answered: 03/12/2018
Poster: Dan Kelley Company: Aetna Bridge Company
Question:
Are the steel repair quantities for each bridge, as noted on sheets 20 and 33, to be included in the bridge lump sums or under the allowance items for the steel girder repairs. It was not clear if the allowance items only covered additional repair locations that are uncovered after blasting.
Answer:
All steel repairs will be paid for under Items 824.9900 and 824.9901.