Date Asked: 10/12/2018 | Date Answered: 10/17/2018 |
Poster: Anthony Mesiti | Company: Cardi Corporation |
Question:
Please provide plans showing the layout of the temporary precast barrier. |
|
Answer:
Please refer to the Suggested Construction Staging Plans for suggested lane closures to be used in conjunction with the Traffic Control Plans 1-5. |
Date Asked: 10/12/2018 | Date Answered: 10/17/2018 |
Poster: Anthony Mesiti | Company: Cardi Corporation |
Question:
Please provide the jacking loads for the jacking and shoring item. It will be tough to bid this without the loads. |
|
Answer:
Existing superstructure beam end loads are below. Note that these loads are to be used as an aid for prospective bidders and do not alleviate the chosen contractor of the jacking design requirements in the job specifications, including computation of lifting loads. Prospective bidders should also take note of the methods and assumptions used to calculate the design loads, as included in the notes below the loads table, and should be aware that the jacking phasing and method may affect the distribution of loads across the bridge. The provided loads are based on bridge record plans and available field data; actual loads may differ from those shown. |
Date Asked: 10/12/2018 | |
Poster: Gary Garzone | Company: Contracts |
Question:
When you print out the Proposal pages from the Quest Lite program you will see where it states that the Bid Open time is 2:00 PM. You can ignore this. The correct Bid Open time is 1:00 PM. |
|