Questions and Answers For:

Improvements to Railroad Street 2018-CH-047

Please Note: If this is the first time accessing our system on our new web site, you will be required to reset your password.

The ask question function is now disabled;
please call 401-222-2495 with any new questions.

Date Asked: 04/16/2018 Date Answered: 04/19/2018
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Is there a breakdown for the earth excavation? According to the DOQ there is 910 SY of area for Sidewalks and Driveways with 1400 CY of Excavation. That would be an average cut of over 4'.
Answer:
This will be clarified by an addendum.
Date Asked: 04/16/2018 Date Answered: 04/19/2018
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please check 12" RCP and 18" RCP quantities, the DOQ and Plans do not agree. Also, the 3.3.5 structures seem to be carried wrong. There are only 4.4.0 structures on the project.
Answer:
This will be clarified by an addendum.
Date Asked: 04/16/2018 Date Answered: 04/19/2018
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Will a Job Specific be provided for 406.9901?
Answer:
This will be clarified by an addendum.
Date Asked: 04/12/2018 Date Answered: 04/16/2018
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
Code #212.2000 and #937.0200 usually are given a minimum bid price in Quest. Please verify that these do not require a minimum bid price for this project.
Answer:
This will be clarified by an addendum.