Date Asked: 04/16/2018 | Date Answered: 04/19/2018 |
Poster: Joe Colapietro | Company: Cardi Corporation |
Question:
Is there a breakdown for the earth excavation? According to the DOQ there is 910 SY of area for Sidewalks and Driveways with 1400 CY of Excavation. That would be an average cut of over 4'. |
|
Answer:
This will be clarified by an addendum. |
Date Asked: 04/16/2018 | Date Answered: 04/19/2018 |
Poster: Joe Colapietro | Company: Cardi Corporation |
Question:
Please check 12" RCP and 18" RCP quantities, the DOQ and Plans do not agree. Also, the 3.3.5 structures seem to be carried wrong. There are only 4.4.0 structures on the project. |
|
Answer:
This will be clarified by an addendum. |
Date Asked: 04/16/2018 | Date Answered: 04/19/2018 |
Poster: Joe Colapietro | Company: Cardi Corporation |
Question:
Will a Job Specific be provided for 406.9901? |
|
Answer:
This will be clarified by an addendum. |
Date Asked: 04/12/2018 | Date Answered: 04/16/2018 |
Poster: Lee Taylor | Company: D'Ambra Const. Co., Inc. |
Question:
Code #212.2000 and #937.0200 usually are given a minimum bid price in Quest. Please verify that these do not require a minimum bid price for this project. |
|
Answer:
This will be clarified by an addendum. |