Questions and Answers For:

Improvements to Nayatt Road 2018-CH-049

Please Note: If this is the first time accessing our system on our new web site, you will be required to reset your password.

The ask question function is now disabled;
please call 401-222-2492 x 4100 with any new questions.

Date Asked: 05/22/2018 Date Answered: 05/25/2018
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please clarify what the intention of Item 701.8150 Type k Copper Service Pipe is. I could not find any Call outs on the plans. How many locations is this in? What are anticipated runs?
Answer:
Item 701.8150 Type k Copper Service Pipe is provided in the Contract as a contingency item for use when directed by the Engineer in the event that an existing water service is required to be repaired or replaced during the completion of the work.
Date Asked: 05/22/2018 Date Answered: 05/25/2018
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please Provide a Detail for Item 912.9901 Dry Laid Stone Planter Wall.
Answer:
The requirements for Item 912.9901 Dry Laid Stone Planter Wall are included in the Job Specific language and the Standard Specifications. Please refer to these for the requirements. No detail is required.
Date Asked: 05/18/2018 Date Answered: 05/22/2018
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please review Job Specific for 201.9901. It states the item is for Remove, Stockpile and Reset Seashell Walks in the Description.
Answer:
A revised specification will be provided in an addendum.
Date Asked: 05/17/2018 Date Answered: 05/22/2018
Poster: Joe Colapietro Company: Cardi Corporation
Question:
3.5.2 STRUCTURE AT STATION 25+71 HAS LESS THAN 1.5' OF PIPE COVER WHEN ACCOUNTING FOR PIPE THICKNESS. THIS IS UNBUILDABLE PER SPEC. PLEASE ADVISE. THERE IS ALSO A 3.4.1 AT 25+35 WHERE THE PIPE FROM THE NORTH ONLY HAS 1.8' OF COVER TO RIM, BUT ALSO CALLS FOR A DROP INLET TO BE BUILT OVER IT. THIS IS NOT BUILDABLE. THERE ARE ALSO 2 OTHER 3.4.1 STRUCTURES WITH THE PIPE COMING IN THROUGH THE CORBEL OF THE STRUCTURE. WILL THIS BE ACCEPTABLE?
Answer:
This issue will be addressed by addendum.