Questions and Answers For:

2019 Paver Placed Elastomeric Surface Treatment (PPEST) Contract 1 2018-CR-102

Please Note: If this is the first time accessing our system on our new web site, you will be required to reset your password.

The ask question function is now disabled;
please call 401-563-4383 with any new questions.

Date Asked: 02/08/2019 Date Answered: 02/08/2019
Poster: Raymond Giordano Company: Cardi Corporation
Question:
Code 906.9910 refers to Section 905 Sidewalks and Driveways. Are the bituminous driveways in the sidewalk areas included in the lump sum? If so, what are the construction limits?
Answer:
The bituminous driveways are included in Code 906.9910 the construction limits are the driveway aprons from the pavement gutter line to the back of the sidewalk.
Date Asked: 02/08/2019 Date Answered: 02/08/2019
Poster: Raymond Giordano Company: Cardi Corporation
Question:
Note 4 on the Pippin Orchard Road sidewalk plan states "ALL MAIL BOXES AND TRAFFIC SIGNS LOCATED WITHIN THE SIDEWALK PAY LIMITS THAT REQUIRE REMOVE AND RESET OR REPLACEMENT WILL BE PAID FOR SEPARATELY UNDER THE APPROPRIUATE UNIT BID PRICE." There are no bid items for this work.
Answer:
Note 4 will be revised to state that all mail boxes and traffic signs located within the sidewalk pay limit shall be included in Code 906.9910. An addendum will be issued to reflect the changes.
Date Asked: 02/07/2019 Date Answered: 02/07/2019
Poster: Fred Sarmento Company: D'Ambra Construction
Question:
Pippen Orchard Road has four locations with some form of curbing and/or curb and sidewalk. Please clarify the locations included within the lump sum item 906.9910
Answer:
The referenced locations are included in the Lump Sum item 906.9910.
Date Asked: 01/30/2019 Date Answered: 01/30/2019
Poster: Gary Garzone Company: Contracts
Question:
The Advertising CD has no Quest Lite Bid File. When will it be available ?
Answer:
The Quest Lite Bid file will be available to download from the State Purchasing web-site once the First Addendum is issued.