Date Asked: 03/27/2018 | Date Answered: 03/29/2018 |
Poster: Lee Taylor | Company: D'Ambra Const. Co., Inc. |
Question:
Page JS 34 details a spec for T08.1700 Remove and Relocate Light Standard. Is there a bid item for this? |
|
Answer:
An addendum will be issued which will include this item. |
Date Asked: 03/27/2018 | Date Answered: 03/29/2018 |
Poster: Lee Taylor | Company: D'Ambra Const. Co., Inc. |
Question:
Note #4 of the TMP allows a rolling road block to close Route 37 for 15 minutes to allow erection of portions of sign structures over Route 37. 15 minutes does not seem enough time to actually erect overhead portions of work. Please review. |
|
Answer:
Based on our experience, 15 minute rolling road blocks are adequate for this type of work. The Contractor may use multiple 15 minute intervals, separated by intervals of open lanes, to erect the sign structure. |
Date Asked: 03/27/2018 | |
Poster: Lee Taylor | Company: D'Ambra Const. Co., Inc. |
Question:
Type your questions here. |
|
Date Asked: 03/15/2018 | Date Answered: 03/15/2018 |
Poster: jody richards | Company: RIDOT |
Question:
Bid Opening Date |
|
Answer:
Please be aware that the bid opening date for this project will be postponed to April 6th. An addendum will be posted soon. |
Date Asked: 03/08/2018 | Date Answered: 03/12/2018 |
Poster: Joshua Carr | Company: Narragansett Improvement Co |
Question:
It appears there are no items for conduit underground while the plans call for conduit underground. Also it appears that plans call for conduit under pavement where pavement work is proposed per civil plans and conduit should be paid underground in those areas. Can this be clarified? |
|
Answer:
Clarification will be provided by addendum. |