Date Asked: 03/21/2018 | Date Answered: 03/23/2018 |
Poster: Patricia Teeter | Company: Pare Corporation |
Question:
May the letter of transmittal and table of contents be submitted as preface materials (along with the RIVIP Bidder Certification Form) and NOT counted towards the 25-page limit? |
|
Answer:
Yes |
Date Asked: 03/21/2018 | Date Answered: 03/23/2018 |
Poster: Patricia Teeter | Company: Pare Corporation |
Question:
Please confirm that the following documents may be submitted as exhibits and NOT counted towards the 25-page limit: resumes and licenses, all required forms, SF-330, and subconsultant letters and DBE/MBE/WBE certifications. |
|
Answer:
They will not be counted as part of the 25 page limit |
Date Asked: 03/21/2018 | Date Answered: 03/23/2018 |
Poster: Patricia Teeter | Company: Pare Corporation |
Question:
Does RIDOT anticipate having the consultant provide land surveys for completing Preliminary Traffic Signal Design or do they want us to use existing GIS aerial photos? |
|
Answer:
Survey services will not be required to develop preliminary design plans. The use of existing contract plans or aerial imaging is acceptable. |