define('RSS_READER_CACHE_ON', false); define('RSS_READER_CACHE_DIR', '/tmp/rsscache'); define('RSS_READER_CACHE_AGE', '3600'); define('CURL_PATH', '/usr/local/bin/curl'); ?>
Please Note: If this is the first time accessing our system on our new web site, you will be required to reset your password.
Date Asked: 01/17/2019 | Date Answered: 01/22/2019 |
Poster: Anthony Mesiti | Company: Cardi Corporation |
Question:
Item No. 824.9901 includes 2900 Lbs as directed by Engineer and Item No. 825.9901 includes 2000 SF as directed by Engineer. It will be difficult to bid the as directed by Engineer because details and locations are unknown. The Department should remove the quantity or provide typical details and locations for the as directed. |
|
Answer:
The additional quantity is included under these items as a contingency should the repair areas need to be enlarged due to existing field conditions. No new details or locations are anticipated. |