Questions and Answers For:

Improvements to Taunton Avenue 2019-CH-032

Please Note: If this is the first time accessing our system on our new web site, you will be required to reset your password.

Date Asked: 09/17/2019 Date Answered: 09/19/2019
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Item 902.9901 Steel Bollard has no detail provided. Please advise what we are expected to furnish and install.
Answer:
A detail will be provided by addenda.
Date Asked: 09/17/2019 Date Answered: 09/19/2019
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Sheet 28 does not have callouts for the structures. Can this be added to identify what these structures are.
Answer:
We are confused by this question. The callouts are on the plan sheet. The drainage structures on the curbline of Taunton Ave are shown on the Drainage & Utility Plans 3 and 4.
Date Asked: 09/11/2019 Date Answered: 09/19/2019
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Note Q on Sheet JS-7 states that no more than half of the parking spaces(new or existing) shall be taken at one time. The proposed area has a total of 16 new spaces. Please confirm the contractor only has to make atleast 8 spaces available at all times.
Answer:
This issue will be clarified by addendum.
Date Asked: 09/11/2019 Date Answered: 09/11/2019
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please Provide the Soil Management Plan.
Answer:
A soil management plan will be provided by addendum. The bid opening date will be postponed to allow time for review.