Questions and Answers For:

Old Tower Hill Road 2019-CH-083

Please Note: If this is the first time accessing our system on our new web site, you will be required to reset your password.

The ask question function is now disabled;
please call 401-563-4100 with any new questions.

Date Asked: 08/27/2019 Date Answered: 09/09/2019
Poster: Raymond Giordano Company: Cardi Corporation
Question:
Code 704.9901 calls for reconstructing a type f catch basin to a catch basin w/gutter inlet RI Standard 3.4.1. The DOQ also list 3' of 12" ductile iron pipe at the same locations. Standard 3.4.1 does not have pipe connecting the gutter inlet to the catchbasin. Please provide a detail for this item.
Answer:
The quantity for 3’ of ductile iron pipe that coincides with the locations of item 704.9901 have been removed as part of Addendum No. 2. The drainage structure at these locations shall be reconstructed in conformance with RI Std. Detail 3.4.1.
Date Asked: 08/26/2019 Date Answered: 08/27/2019
Poster: Raymond Giordano Company: Cardi Corporation
Question:
Items 012, 014 and 018 in the DOQ all refer to code 905.0110, 365 or 367 cy. The quantity for 905.0110 is actually 243 cy. Please review.
Answer:
The quantity for this item is being reviewed and will be revised by Addendum 2 if needed.
Date Asked: 08/22/2019 Date Answered: 08/27/2019
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
Will the actual bid file be available before the question portal closes? Often the Quest bid form needs modifications that are brought up while the portal is still available.
Answer:
Addendum 1 has been posted and the Quest Lite bid file is available.
Date Asked: 08/19/2019 Date Answered: 08/27/2019
Poster: Raymond Giordano Company: Cardi Corporation
Question:
When will the addendum be posted?
Answer:
Addendum 1 has been posted.
Date Asked: 08/15/2019 Date Answered: 08/15/2019
Poster: Gary Garzone Company: Contracts
Question:
The Quest Lite Bid File on the Advertising CD will not Import in the Quest Lite Bid Program. When will the Bid file be corrected ?
Answer:
A new Bid file will be available once the first Addendum is posted. It will be available for download from State Purchases web-site.