Date Asked: 01/29/2021 Date Answered: 02/01/2021
Poster: Robert McGoodwin Company: Econolite Control Products
Question:
Recognizing that system solutions and requirements are complex, can the Department please advise how a vendor can provide documentation within the bid to clarify satisfaction or potential alternative means to satisfy a requirement?
Answer:
A compliance functional requirement matrix along with post bid instructions will be provided by addendum.
Date Asked: 01/27/2021 Date Answered: 02/01/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please provide Details for the Temporary Sediment Traps.
Answer:
Temporary Sediment Trap Details are provided on Drainage Details No. 2.
Date Asked: 01/27/2021 Date Answered: 02/01/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
1. The contract drawings state that pedestals less than 2" shall be cast with non-shrink grout and paid under 808.9901. Please clarify how the pedestals greater than 2" are paid for. 2. JS-103 states that the bearing pedestal grout is paid by the Cubic Inch but the DOQ states Cubic Foot. Please clarify which is correct.
Answer:
Pedestals greater than 2” shall be paid for under item code 808.0506 concrete substructure class HP ¾” abutment stems. A note will be added to the plan set by addendum. Bearing Pedestal grout is paid by the Cubic Foot. JS-103 was updated as part of addendum 5.
Date Asked: 01/27/2021 Date Answered: 02/01/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Cross Section Sheets 85 and 86 both have the 1029+50 and 1029+00 stations on them and skip past 1030+00 and 1030+50.
Answer:
Cross Sections will be revised by addendum.
Date Asked: 01/26/2021 Date Answered: 02/01/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please review temporary sheeting left in place at the Shared use path wall and the Garfield wall. The bedrock seems to be high in those areas and we don't believe sheeting will work because of this. Please advise.
Answer:
Temporary sheeting piling steel abandoned in place standard item will be updated to a job specific item and a specification will be provided by addendum.
Date Asked: 01/26/2021 Date Answered: 02/01/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please Review Addendum #5 Cross Sections Sheets 76, 77, 78, 79. It is the same error as was in the original Plans. These sheets are calling out the exact same stations. Station 1009+00, 1009+50, 1010+00, 1010+50, 1011+00, and 1011+50 are repeated on these pages. It then jumps from Station 1011+50 to 1018+00. Please provide the missing cross sections.
Answer:
Cross Sections will be revised by addendum.
Date Asked: 01/25/2021
Poster: Gary Garzone Company: Contracts
Question:
Please note that the PDF copy of Addendum 5 exceeds 2,000 pages. All pages do open. Plan file sheets may take a few minutes to appear on the screen.
Date Asked: 01/19/2021 Date Answered: 01/20/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Item 702.0400 Sanitary Sewer Manhole is as Needed. Please clarify how bypass pumping is paid if it is required for this work. Without knowing specifics about location, etc, we cannot properly quote this.
Answer:
This item was added as a contingency in the case unknown or unmarked manholes are encountered. Additional utility item will be added to account for other utility work. Additional items will be added to account for unknown or changing utility conditions.
Date Asked: 01/19/2021 Date Answered: 01/20/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please clarify how excavation is paid for BMPs that are located in cut areas. And what are the limits?
Answer:
Excavation is included in the Lump Sum items for the various BMPs.
Date Asked: 01/19/2021 Date Answered: 01/20/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Once Contaminated Soil is in place on site, how is dust control paid for?
Answer:
Dust Control is included in the Lump Sum Item 202.9901.
Date Asked: 01/15/2021 Date Answered: 01/20/2021
Poster: Susan Cullen Company: J.H. Lynch & Sons, Inc.
Question:
Please provide the Site Investigation Report (SIR) as referenced in the Remedial Action Work Plan (RAWP), JS-14 , and JS-23.
Answer:
The SIR will b provided by addendum.
Date Asked: 01/14/2021 Date Answered: 01/15/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Sheet A5 states that fabricator for the steel repairs must be certified for Major Steel Bridge. Usually steel repairs require Simple Steel Bridge not major Steel Bridge. Please clarify if Simple Steel Bridge certified is ok.
Answer:
Simple Steel Bridge Certification is acceptable. Note shall be updated per addendum.
Date Asked: 01/14/2021 Date Answered: 01/15/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please Clarify. Is the Wetland Restoration Plan No.1(Sheet 93), the Wetland Mitigation plan?(Item L01.9901)
Answer:
Wetland Mitigation item is associated with the work on Page 93 of the plans. Spec will be revised for clarification. The proposed work on page 92 is quantified through the various work items (excavation, loam & seed, trimming and fine grading, sediment trap, and others).
Date Asked: 01/13/2021 Date Answered: 01/15/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Please clarify what Item 205.5070 Temp Timber Sheeting is used for and where it is located.
Answer:
Temporary Timber Sheeting shall be used for SOE at Bridge 904 West Abutment required for Temporary Support of Bridge for jacking and shoring (see General Temporary and Jacking and Shoring Sheet A9) and 6'-9" End post transition base excavation at Bridge 903 (See Bridge No. 903 End Post Details 2 Sheet B15) and Bridge 904 . Call outs shall be updated for clarification by addendum.
Date Asked: 01/11/2021 Date Answered: 01/15/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
There is no item in the contract for Maintenance and Cleaning of Erosion and Pollution Control.
Answer:
The specification will be modified, a pay item will be created for maintenance and cleaning of erosion and pollution controls.
Date Asked: 01/11/2021 Date Answered: 01/14/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please clarify the location and/or locations of the Infiltration Trench(Item 703.9909).
Answer:
Infiltration trench location will be clarified by addendum.
Date Asked: 01/08/2021 Date Answered: 01/08/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please Clarify Items: 201.9905 - 201.9908 Specifications. If they are intended to be Stockpile only, all of the written Job Specifics state that its on the contractor to Remove, Stockpile, and then reset the items.
Answer:
Clarification will be issued by addendum.
Date Asked: 01/08/2021 Date Answered: 01/08/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Are there existing asphalt cores to show what the existing roadway depths are?
Answer:
Yes, pavement core data can be provided.
Date Asked: 01/07/2021 Date Answered: 01/07/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please Clarify Where all the Remove and Reset Items are being reset to. Items: 201.9905 - 201.9908
Answer:
Items will be removed and stockpiled as they are private property encoraching on state highway layout. Items and locations will be clarifired by addendum.
Date Asked: 01/06/2021 Date Answered: 01/07/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Item 909.9901 Haul and Install Moveable Barrier, Please specify where this barrier is being picked up from. Will the contractor be responsible for Loading the barrier at the pick up location.
Answer:
The moveable barrier is located within the laydown area within the interchange currently utilized by RIBTA. The contractor will be responsible for the loading of the barrier at the pick up location.
Date Asked: 01/06/2021 Date Answered: 01/07/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Item 703.9907, 703.9908, 703.9909 include all legal disposal of excess material. As we cannot determine what level of contaminant is in the soil, please advise how this is to be bid. Can this be added to the disposal items already in the project?
Answer:
All material that has been characterized to be disposed of as described in the RAWP will be paid for under items 202.9902, 202.9903, or 202.9904. Any surplus material which does not require remediation will be disposed of and included in Items 703.9901-703.9906. Management of contaminated soil will be paid for under Item 202.9901. The RAWP describes the exceedances in previously tested soil, however, soil must be characterized prior to disposal. Quantities for the disposal items from Items 703.9907 - 703.9909 are included in the disposal items.
Date Asked: 01/06/2021 Date Answered: 01/06/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
The signal vendors are asking if there any way we can request a 2 week bid extension because the questions remain unanswered on the traffic side of the project ?
Answer:
An addendum will be issued extending the bid date two weeks to allow additional time for bidders.
Date Asked: 01/06/2021 Date Answered: 01/08/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Item 817.9901 Reinforcing Steel Bank. Addendum No. 2 did not change quest lite to include this item as an only acceptable bid price of $1.
Answer:
The unit price will be updated as only acceptable bid by addendum.
Date Asked: 01/06/2021 Date Answered: 01/07/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Page CS-12 states that the no work be allowed prior to July 1, 2021. Please clarify that this applies to the entire project or just parts of the project.
Answer:
This note applies to the entire project.
Date Asked: 01/06/2021 Date Answered: 01/07/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Item 202.9901 states that construction entrances/stone stabilized pads are included under this item. There is also an item in the project for that(211.0100). Please clarify where the stone entrances are being paid.
Answer:
Construction entrances shall be paid for under Item 202.9901, 211.0100 will be removed from the contract.
Date Asked: 01/06/2021 Date Answered: 01/07/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please Clarify, Does the TMP Times provided in Addendum 2 Replace all of the original TMP Time Sheets?
Answer:
A revised TMP was not included in Addendum 2. There is a TMP that was included as part of the Remedial Action Work Plan that was used for the work associated with soil sampling. The TMP originally included in the advertising documents should be used.
Date Asked: 01/06/2021 Date Answered: 01/08/2021
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
Item #177 - Temporary sheet piling calls for 1206 SF at Admiral Kalbfus Road. Please describe where along Admiral Kalbfus Road this is being used.
Answer:
Temporary Sheet piling at Admiral Kalbfus Road is shown in Volume 4 Retaining Walls, Earth Retaining Systems Details Sheet (13 of 19).
Date Asked: 01/06/2021 Date Answered: 01/08/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Please clarify how the R & D Shear Studs at Bridge 904 are paid for.
Answer:
R&D Shear Studs at Bridge 904 shall be included in the cost of 803.0300 Partial Removal and Disposal of Existing Concrete Masonry per Bridge No. 904 Deck Details Note 2.
Date Asked: 01/06/2021 Date Answered: 01/06/2021
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
What are the street addresses of the buildings being demolished? There is no indication in the DOQ, and there is no Job Specific to describe the exact locations.
Answer:
The street addresses for the buildings to be demolished are 56 Halsey St, 58 Halsey St, 60 Halsey St, and 65 Halsey St (2) as shown on the plans. At 65 Halsey Street the maintenance garage and the scale house will be demolished. The DOQ will be clarified.
Date Asked: 01/05/2021 Date Answered: 01/06/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please provide RIDEM and United States Army Corps of Engineers Permits.
Answer:
Permits will be provided prior to project award.
Date Asked: 01/05/2021 Date Answered: 01/08/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
805.9901 - MSE Walls. Would the Department consider using other walls - GRS Walls in lieu of the MSE walls?
Answer:
For the purposes of the bidding phase, bidders should base their bids on the project plans as advertised. It is possible that an alternative wall type could be considered during construction, however there should be no assumption in the development of the bids that an alternative would be accepted. It should also be noted that the Contractor would be responsible for confirming Moment slab, timber rail and other MSE Wall related details will conform to the Contractor proposed wall type. Any changes to these details due to the Contractor proposed wall type shall be designed and stamped by a Professional Engineer Registered in RI. Contractor shall have a Professional Geotechnical Engineer registered in RI certify that the Contractor proposed wall type is adequate for the soils and drainage at the project site. There will be no additional payment for any changes to the proposed wall type or associated work.
Date Asked: 01/05/2021 Date Answered: 01/06/2021
Poster: Peter Calcagni Company: Manafort Brothers Inc
Question:
Item 703.9901-703.9906 Basis of Payment is to include all legal disposal of surplus material. Should we get paid under 202.9901 for the management of the material? How can we determine the disposal cost since we do not know the level of contamination of the excavated material? Should we get paid under 202.9902 and 202.9903 or 202.9904 dispose of this material once it is characterized?
Answer:
All material that has been characterized to be disposed of as described in the RAWP will be paid for under items 202.9902, 202.9903, or 202.9904. Any surplus material which does not require remediation will be disposed of and included in Items 703.9901-703.9906. Management of contaminated soil will be paid for under Item 202.9901. The RAWP describes the exceedances in previously tested soil, however, soil must be characterized prior to disposal. Disposal of Contaminated Soil will be paid for per the specification.
Date Asked: 01/05/2021 Date Answered: 01/07/2021
Poster: Peter Calcagni Company: Manafort Brothers Inc
Question:
Item L01.9902 Basis of Payment is to include all legal disposal of surplus material. We are going to be paid under 202.9901 for the management of the material. How can we determine the disposal cost since we do not know the level of contamination of the excavated material? Should we get paid under 202.9902 and 202.9903 or 202.9904 dispose of this material once it is characterized?
Answer:
All material that has been characterized to be disposed of as described in the RAWP will be paid for under items 202.9902, 202.9903, or 202.9904. Any surplus material which does not require remediation will be disposed of and included in Item L01.9902. The RAWP describes the exceedances in previously tested soil, however, soil must be characterized prior to disposal. Disposal of Contaminated Soil will be paid for per the specification.
Date Asked: 01/05/2021 Date Answered: 01/06/2021
Poster: Peter Calcagni Company: Manafort Brothers Inc
Question:
Item L01.9901 Basis of Payment is to include all legal disposal of surplus material. We are going to be paid under 202.9901 for the management of the material. How can we determine the disposal cost since we do not know the level of contamination of the excavated material? Should we get paid under 202.9902 and 202.9903 or 202.9904 dispose of this material once it is characterized?
Answer:
All material that has been characterized to be disposed of as described in the RAWP will be paid for under items 202.9902, 202.9903, or 202.9904. Any surplus material which does not require remediation will be disposed of and included in Item L01.9901. The RAWP describes the exceedances in previously tested soil, however, soil must be characterized prior to disposal. Disposal of Contaminated Soil will be paid for per the specification.
Date Asked: 01/04/2021 Date Answered: 01/08/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Sheet A9 of 112 Note 7 states that paved waterways shall be included in Item 921.0100. Please clarify if the area of the paved waterway will be measured per SY for payment.
Answer:
Paved waterway shall be incidental to the slope paving area and will not be measured separately for payment. Sheet A9 of 112 Note 7 will be updated to clarify by Addendum.
Date Asked: 01/04/2021 Date Answered: 01/06/2021
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
Is there supposed to be a lump sum bid item for Sediment Trap #3 as shown on sheet #92 of the plans?
Answer:
Sediment Trap quantities will be clarified by addendum.
Date Asked: 01/04/2021 Date Answered: 01/08/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Item 802.9904 - Timber Blocking. - The specs state that the item is paid by the each. Please clarify what each is defined as.
Answer:
The quantity is per each shoring location where timber blocking units are furnished and installed. The quantity and specification for Item 802.9904 - Timber Blocking will be updated by Addendum.
Date Asked: 12/31/2020 Date Answered: 01/06/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Please clarify where the R & D Existing Slope pavers for bridge 903 is paid for.
Answer:
R&D Existing Slope Pavers for bridge 903 shall be paid for under 802.9901 Temporary Support Bridge No. 903 as per the Job Specific Specification Code 802.9901 Temporary Bridge No. 903.
Date Asked: 12/31/2020 Date Answered: 01/07/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Item 808.0506 - Abut Stems . DOQ shows 5 CY for Bridge 903. Please clarify where this quantity is located.
Answer:
The quantity will be updated by addendum.
Date Asked: 12/30/2020 Date Answered: 01/06/2021
Poster: James-Michael Trotta Company: Ocean State Signal
Question:
Job Specific Specifications for Items T04.9904; T12.9906; & T13.9904 call for FLIR TrafiSense Thermal Traffic Detector system or approved equivalent. FLIR is the only manufacturer of a thermal video detection system in the industry, and only a single vendor has exclusive distribution rights in Rhode Island. Would a non-thermal video detection system be accepted for use on this project, or is it RIDOT’s intention to only procure the proprietary detection system for this project?
Answer:
The vehicle detection system furnished and installed on this project shall be a thermal based video detection system, and no other type of video detection system will be accepted.
Date Asked: 12/30/2020 Date Answered: 01/06/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Is protective shielding required for Br 904?
Answer:
Protective Shielding will be added by addendum.
Date Asked: 12/30/2020 Date Answered: 01/06/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Item 928.0500 - TMA the contract calls for 11,520 hrs. This quantity seems excessive for this project. Please recheck quantity.
Answer:
The estimated hours for the TMA will remain as currently provided in the Contract based on the construction duration and required traffic control setups for the project. A minimum bid of $75.00/hour has been set for the Contract.
Date Asked: 12/29/2020 Date Answered: 01/06/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Volume 4 - sheet 15 calls for polyurethane elastomeric sealant. The contract does not have a pay item for the joint sealant.
Answer:
Item will be added by Addendum.
Date Asked: 12/29/2020 Date Answered: 01/08/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Item 808.0800 -Std. 10.3 Wall . Please clarify how the epoxy rebar, rubbing, weep holes and crushed are paid for. Standard specifications state these items are paid separate to Item 808.0800 but no items are included in the bid.
Answer:
The wall will be paid for complete in place for all components. A special provision will be provided for clarification.
Date Asked: 12/29/2020 Date Answered: 01/06/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Please clarify how the rub plates for the keeper blocks are paid for.
Answer:
Rub plate payment to be clarified by addendum.
Date Asked: 12/29/2020 Date Answered: 01/06/2021
Poster: Peter Calcagni Company: Manafort Brothers Inc
Question:
Can you please clarify where the mechanical splices for the rebar at the backwall and deck haunch for each phase gets paid?
Answer:
Mechanical Splices at phase lines get paid under 810.9901 Mechanical Connectors. This item was added as part of Addendum 2.
Date Asked: 12/29/2020 Date Answered: 01/06/2021
Poster: Peter Calcagni Company: Manafort Brothers Inc
Question:
Can you please clarify which item the keeper blocks get paid under for bridge no 903,904 and 907?
Answer:
Keeper Blocks to be paid for under 808.506 Concrete substructure Class HP 3/4" Abut Stems.
Date Asked: 12/28/2020 Date Answered: 01/06/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Item 824.9901 - Steel Repairs - Br. 904 - DOQ states 5,074 lbs but plans calculate approx. 2146 lbs and Br. 907 - DOQ states 3247 lbs but plans calculate approx. 2336 lbs. Please clarify where the difference is quantity is located. Also DOQ shows 500 lbs for a top flange repair bank, please provide a typical detail for the top flange repair so we can put a cost to the 500 lbs.
Answer:
Quantities will be clarified by addendum. Typical Top Flange Repair detail will be added by addendum.
Date Asked: 12/28/2020 Date Answered: 01/06/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Please clarify how the new sole plates for Bridges 903 and 907 are paid for?
Answer:
Sole plates shall be paid for under 828.0303 per General Bearing Details, Br. 903 & Br. 907 Bearing Notes 12.
Date Asked: 12/22/2020 Date Answered: 01/06/2021
Poster: James-Michael Trotta Company: Ocean State Signal
Question:
The project specification for item T12.9909 Traffic Signal Control System appears to be written exclusively for the Cubic Trafficware ATMS.now/SynchroGreen system. Multiple systems can provide the features/functions requested in the specification. However, the language of the project specification is written so restrictively in terms of the manner in which those features/functions are provided and fulfilled that all other Central Management System and Adaptive Signal Control Technology Systems in the market are precluded. Please confirm that an alternative Central Management System and Adaptive Signal Control Technology System and it's respective methods of providing and fulfilling the features/functions are acceptable?
Answer:
The specification for item T12.9909 Traffic Signal Control System is not written to favor any specific Central Management System (CMS)/Adaptive Signal Control Technology (ASCT). It is a functional requirement specification to allow for various systems to be supplied by the different traffic signal controller manufacturers. The specification calls for an integrated Central Management System /Adaptive Signal Control Technology software from the same traffic signal controller manufacturer to provide to RIDOT one system to operate and maintain the corridor without the need to have multiple different systems by various manufacturers.
Date Asked: 12/21/2020 Date Answered: 01/04/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please provide cut and fill cross sections for parking lot, or a Grading plan which shows existing grades.
Answer:
Grading plan will be clarified by addendum.
Date Asked: 12/21/2020 Date Answered: 01/04/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please provide Cross Sections for the 800 Stations(Plaza Entrance).
Answer:
Cross Sections will be provided by addendum.
Date Asked: 12/19/2020 Date Answered: 01/06/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Please clarify if a self propelled concrete finishing machine is required for the placement of the concrete deck replacement at Bridges 903 904 and 907. Some of the pours are to small for the finishing machine.
Answer:
Alternative finishing methods may be proposed for approval during construction but only when the pours are too narrow for finishing machines as specified in Section 814.
Date Asked: 12/18/2020 Date Answered: 01/04/2021
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please Provide Specifications for Items 999.9920, 999.9921, 999.9923, and 999.9924.
Answer:
Specifications will be added or clarified by addendum.
Date Asked: 12/16/2020 Date Answered: 12/21/2020
Poster: Joe Colapietro Company: Cardi Corporation
Question:
ITEM 909.9901 - Haul and install double faced moveable barrier describes spacing timbers and concrete grout. Is there an installation detail showing this and how it is to be installed? For hauling purposes, where is this barrier coming from? Is the contractor responsible for loading at the pickup site? The specification also mentions drop off times, what is being dropped off? Below basis of payment it states price constitutes full compensation for Furnishing and placing units. Please confirm the contractor is not responsible for furnishing the moveable barrier for this item.
Answer:
Specification will be clarified by addendum.
Date Asked: 12/15/2020 Date Answered: 12/21/2020
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Item 202.9904 States that it should be an authorized lump sum of $100,000.00, but the quest file only shows it as a $50,000.00 minimum. Please advise.
Answer:
Clarification to the authorized lump sum amount will be issued by addendum.
Date Asked: 12/15/2020 Date Answered: 12/23/2020
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please clarify how Item 203.9901 - Dewatering is paid. The Basis of Payment States that it should be an authorized lump sum of $50,000, but quest does not have the item set up that way. Please advise how this item is intended to be paid. What if the cost goes above the Estimated $50,000.00 cost?
Answer:
The specification and payment will be clarified by addendum. Note that the cost of dewatering is inclusive in several lump sum items.
Date Asked: 12/11/2020 Date Answered: 12/21/2020
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please review sheet 80 of volume 1. There seems to be missing descriptors of what pipe is be installed.
Answer:
Pipe size on this sheet will be added by addendum.
Date Asked: 12/10/2020 Date Answered: 12/16/2020
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please clarify what item 808.0504 is used for. It is shown in the DOQ as part of the Garfield Wall.
Answer:
808.0504 CONCRETE SUBSTRUCTURE CLASS XX ¾” WALL FOOTING is used for the moment slab footing as indicated in Volume 4, Job Specific General Notes Sheet 2, Materials, and on Garfield Street Retaining Wall Details sheet in the notes.
Date Asked: 12/10/2020 Date Answered: 12/16/2020
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please clarify what Item 808.0323 is used for. It is shown in the DOQ on the Shared Use path.
Answer:
808.0323 CONCRETE SUBSTRUCTURE CLASS HP ¾” PARAPETS is used for the moment slab barrier as indicated in Volume 4, Job Specific General Notes Sheet 2, Materials, and on Garfield Street Retaining Wall Details sheet in the notes. The DOQ description shall be revised to state “Garfield Street Wall”
Date Asked: 12/10/2020 Date Answered: 12/16/2020
Poster: Joe Colapietro Company: Cardi Corporation
Question:
How is the Reinforced Backfill for the MSE wall paid for?
Answer:
The cost to furnish and install the reinforced backfill is included in the cost of the MSE wall as per the job specific specification Code 805.9901 MSE Retaining Wall Systems with Precast Concrete Facing.
Date Asked: 12/10/2020 Date Answered: 12/16/2020
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please review Item 817.9901 - Reinforcing Steel Bank. Should this be provided as a Specified Write in number? There is currently no pricing attached to this item in the Quest Bid File.
Answer:
The quantity and price for Item 817.9901 Reinforcing Steel Bank will be updated by addendum.
Date Asked: 12/10/2020 Date Answered: 12/16/2020
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please review Cross Section Sheets 76-79. There seems to be errors.
Answer:
Comment is noted and the sheets will be reviewed and revised if necessary.
Date Asked: 12/09/2020 Date Answered: 12/16/2020
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Can stay in place forms be used for bridge deck construction?
Answer:
No. Per RIDOT standards stay in place forms require an 8 inch deck thickness. The proposed deck thickness shall match the existing deck thickness of 7 inches.
Date Asked: 12/08/2020 Date Answered: 12/14/2020
Poster: Joe Colapietro Company: Cardi Corporation
Question:
When will the Remedial Action Work Plan be added to the bid documents?
Answer:
The information will be provided in a future addendum.
Date Asked: 12/08/2020 Date Answered: 12/08/2020
Poster: Kate Sweeney Company: E.W. Audet & Sons, Inc.
Question:
Will a specification for lighting fixtures be issued via addendum?
Answer:
Yes, additional information on the lighting fixtures will be provided by addendum.
Date Asked: 12/04/2020 Date Answered: 12/08/2020
Poster: Joe Colapietro Company: Cardi Corporation
Question:
The field office specification reads that it is intended to cover the length of the job and 180 days past completion. The field office has 54 months, but the completion date shows July 31, 2024. This is not going to account for 48 months of construction. Please advise.
Answer:
This will be revised by addendum.
Date Asked: 12/02/2020 Date Answered: 12/02/2020
Poster: jody richards Company: RIDOT
Question:
Can the advertising period be extended?
Answer:
An addendum will be issued extending the bid opening date.