Date Asked: 09/20/2021 | Date Answered: 09/22/2021 |
Poster: Joseph Giordano | Company: GRA, a division of GM2 |
Question:
Do the graphics in RIDOT's March 19, 2021, INFRA Grant Application show the latest (current) concept for the proposed missing movements ramps? Are there better/more detailed graphics available? |
|
Answer:
The graphics in RIDOT’s March 19, 2021 INFRA Grant application show the latest concept for the proposed missing movement ramps at I-95 and Rt 4. There are no better/more detailed graphics available. |
Date Asked: 09/14/2021 | Date Answered: 09/17/2021 |
Poster: Joseph Giordano | Company: GRA, a division of GM2 |
Question:
Are details available on specific locations where the noise balloting task will be required? |
|
Answer:
The preliminary Noise Barrier Analysis is still under review so RIDOT cannot provide specific locations where the noise balloting task will be required. |
Date Asked: 09/13/2021 | Date Answered: 09/17/2021 |
Poster: Joseph Giordano | Company: GRA, a division of GM2 |
Question:
Will photogrammetric mapping be provided by RIDOT, or will the selected consultant have to obtain new mapping? |
|
Answer:
Base mapping from the Scoping effort will be provided as part of this contract. Base mapping for final design will be the responsibility of the DB entity. |
Date Asked: 09/09/2021 | Date Answered: 09/20/2021 |
Poster: Joseph Bambara | Company: CME/CHA |
Question:
If we provide a one page project profile sheet for each of the required project examples listed in items 4 and 5 on page 14 of the RFQ, are those sheets counted in the 20 page limit or are they considered exhibits and not included in the page limitation as listed in item 2 on page 13? |
|
Answer:
Per the RFP Section I, page 12&13, Qualifications (Firm and Staff) is included in the 20-page limit. |
Date Asked: 09/07/2021 | Date Answered: 09/17/2021 |
Poster: Joseph Bambara | Company: CME/CHA |
Question:
Section B.1.m (Design Phase Services) on page 6 of the RFP notes that the consultant would be responsible for obtaining environmental permits. In a Design-Build project, this task is normally the responsibility of the DB Entity, since the BTC plans are typically only developed to a 30% level. Should we assume that this task only includes coordinating with agencies and identifying potential required permits for inclusion in the RFP Technical Specifications? |
|
Answer:
It is the Department’s intention to obtain environmental permits during the BTC development. |
Date Asked: 09/07/2021 | Date Answered: 09/20/2021 |
Poster: Joseph Bambara | Company: CME/CHA |
Question:
Section I.5.a.4 (General RFP Requirements) on Page 14 of the RFP requires project experience for the firm being the prime designer for a “similar project”. Would a project where the firm was the prime designer, acting as an Owner’s representative for a Design-Build project with a construction cost in excess of $30 million qualify for this experience? |
|
Answer:
This section is being revised by Addendum. |