Travel Advisories: June 24-30, 2017

Interstate Highway Restrictions

I-95 logo    I-195 logo    I-295 logo

Traffic Pattern Changes - Divided Highway

  • Providence: On I-195 East and West, between the I-95 interchange and Exit 2 (EB: India St./Gano St.; WB: South Main St.), motorists are encountering a divided highway configuration with one lane to the left and three lanes to the right for bridge work. Motorists should not stop in the work zone or change lanes. All lanes go through.

Overnight

  • Cranston/Providence: I-95 North and South, from Elmwood Ave. to Eddy St., alternating lane closures for bridge work, Sunday-Thursday nights from 7 p.m. to 6 a.m. the following day.
  • Providence: I-95 South, from Exit 23 (Rte. 146) to Exit 20 (I-195), alternating lane closures for paving, Sunday-Thursday nights from 9 p.m. to 6 a.m. the following day. Expect delays.

See full list of Interstate Restrictions »

Other Limited Access Highway Restrictions

Rte 4 logo    Rte 10 logo    Rte 37 logo

Temporary Ramp Closure

  • Providence: The ramp from Rte. 10 North to I-95 South will be closed for paving, Sunday-Tuesday nights from 11 p.m. to 6 a.m. the following day. Follow signed detour.

Overnight

  • North Kingstown: Rte. 4 North and South, from I-95 to Rte. 403, partial right lane and shoulder closures for paving and guardrail installation, Sunday-Thursday nights from 8 p.m. to 6 a.m. the following day. Ramp narrowing is possible at Rte. 4 and Division St., Rte. 2, and Rte. 102, Sunday-Thursday nights from 7 p.m. to 7 a.m. the following day.
  • Providence to Lincoln: Rte. 146 North and South, including the ramps, from I-95 to Sherman Ave., left lane closures in a moving operation for bridge work, Sunday-Thursday nights from 8 p.m. to 6 a.m. the following day.

Weekday

  • Charlestown: Rte. 1 North and South, from the Charlestown town line to the South Kingstown town line, right shoulders closed for drainage work, Monday-Friday from 8 a.m. to 5 p.m.

See full list of Other Limited Access Highway Restrictions »

Metropolitan Providence

Rte 5 logo    rte 6 logo    Rte 15 logo

Temporary Road Closures

  • East Providence: Pawtucket Ave., from Warren Ave. to Waterman Ave., road closed for paving, Wednesday and Thursday nights from 9 p.m. to 6 a.m. the following day. Follow signed detour.
  • Johnston: Rte. 5 (Greenville Ave.) at I-295 is closed for Narragansett Bay Commission sewer line installation through November 2017. The work zone has been modified with the closure from Salina Ave. to Atwood Ave. Follow signed detours. Please note: the road will remain open to local traffic and emergency vehicles. Click here for additional information.

Overnight

  • East Providence/Barrington: Rte. 114 North and South, from I-195 to Rte. 103 (County Rd.), partial right lane closures in a moving operation for roadway striping, Tuesday-Thursday nights from 8 p.m. to 5 a.m. the following day.

See full list of Metropolitan Providence Restrictions »

East Bay

Rte 103 logo    rte 114 logo    Rte 136 logo

Weekday

  • Barrington: Massasoit Ave. East and West, from Martin Ave. to County Rd., alternating one-way traffic for bridge work, Monday from 9 a.m. to 3:30 p.m.
  • Bristol: Rte. 136 (Metacom Ave.) at Bayview Ave., alternating one-way traffic for National Grid gas line relocation, Monday-Friday from 9 a.m. to 3 p.m.

See full list of East Bay Restrictions »

Newport County

Rte 24 logo    Rte 77 logo    Ret 138 logo

Weekday

  • Middletown: Rte. 114 (West Main Rd.) North, from Commercial St. to Rockwood Rd., possible lane shifts and closures for construction, Monday-Friday from 7 a.m. to 3:30 p.m.

See full list of Newport County Restrictions »

Northern R.I. & Blackstone Valley

Rte 100 logo    Rte 100 logo    Rte 100 logo

Temporary Bridge Closures

  • Cumberland: The Town-owned Howard Rd. Bridge, which carries Howard Rd. over Abbott Run, is currently closed. Please follow signed detour via Abbot Run Valley Rd. in Cumberland or from Paine Rd. in Massachusetts. More information is available here.
  • North Smithfield: The Slatersville Stone Arch Bridge that carries Rte. 5 (Providence Pike) over the Branch River is currently closed through July. Get Detour Maps »
  • North Smithfield: The Central St. Bridge, carrying Rte. 5 (Central St.) over Rte. 146, is currently closed through late Fall 2017. Get Detour Maps »
  • Smithfield: The Capron Rd. Bridge that carries Capron Rd. over a tributary of the Woonasquatucket River, between Stillwater Rd. and Kane Rd., is currently closed through late Fall 2017. Get Detour Maps »

Weekday

  • Lincoln: Rte. 126, from Mussey Brook Rd. to Desoto Way, alternating one-way traffic for bridge work, Tuesday-Thursday from 7 a.m. to 3:30 p.m.

See full list of Northern R.I. & Blackstone Valley Restrictions »

South County

Rte 78 logo    Rte 108 logo    Rte 216 logo

Overnight

  • Westerly: Expect alternating lane closures in a moving operation for roadway striping on the following roads, Sunday-Thursday nights from 8 p.m. to 5 a.m. the following day: Broad St.; Langworthy Rd.; Potter Hill Rd.; Riverview Dr.; Rte. 1A (Shore Rd.); Tower St.

Weekday

  • South Kingstown: High St. North and South, from the Peacedale Rotary to Main St., alternating one-way traffic for curb and sidewalk work, Monday-Friday from 7 a.m. to 3:30 p.m. Expect delays.
  • Westerly: High St. North and South, under the Rte. 78 West by-pass, partial right lane closures for a bridge inspection, Monday from 8:30 a.m. to 3:30 p.m.

See full list of South County Restrictions »

West Bay

Rte 2 logo    Rte 33 logo    Rte 117 logo

Traffic Pattern Change

  • Warwick: At Apponaug Four Corners (Post Rd. at Centerville Rd. and Greenwich Ave.), a new traffic pattern has been established. Motorists are now required to navigate through the area around traffic barrels as a phase in the roundabout development.  Stay to the right of the barrels.  Please note: construction of the roundabout wall will begin in the center of the barrels.

Temporary Road Closure

  • Warwick: Rte. 117 (Centerville Rd.), east of Meadow St. to Post Rd., remains closed to through traffic for construction until the final traffic configuration is implemented.  Local traffic access will be maintained to the businesses.

Weekday

  • Coventry: Arnold Rd. North and South, from New London Tpke. to Johnson Blvd., one lane of alternating traffic for Town of Coventry sewer work, Monday-Friday from 7 a.m. to 3:30 p.m. through Summer 2017.
  • Warwick: Post Rd. Village, from Apponaug Four Corners to Spruce St., one lane closed, with shoulder closures possible for construction, Monday-Friday from 6 a.m. to 4:30 p.m. Parking may also be impacted within the construction zone.

See full list of West Bay Restrictions »

Transit Service Alerts & News

Providence Station

Construction for improvements to the south plaza at Providence Station will impact parking, taxis, traffic patterns and pedestrians.

Learn More »

Wickford Junction Station

Bus Park & Ride service is available at Wickford Junction, creating a transit hub with bus and rail service with four times as many trips to Providence as before.

Learn More »

Get Schedule »

Interstate Exits in Rhode Island

Did you know? Rhode Island has more than 68 miles of Interstate highway!

I-95 logo

I-195 logo

I-295 logo

CURRENT RIDOT PROJECTS

Projects that are currently underway with the Department of Transportation.

Wickford Junction Train Service

Live Travel Map

Pothole Information

Learn more about
Commuter Rail in R.I.

Parade & Event Restrictions

RIDOT Map Room

Restrictions For Annual
and Blanket Permit Vehicles

Spot a roadway hazard?

Contact our Transportation Management Center 24/7 at 401-222-3005

Highway Advisory Radio

HAR tower   Find & Listen to our Traffic Broadcasts!