Top Traffic Cams

Camera at I-95 at KinsleyI-95 at Kinsley

Camera at I-95 at Broad StI-95 at Broad St

Camera at I-95 at LonsdaleI-95 at Lonsdale

Camera at I-195 at WB SplitI-195 at Exit 2

Camera at I-195 Washington BridgeI-195 Washington Bridge

Camera at Rte 6 Dean StreetRte 6 at Dean Street

Find All Traffic Cameras by Region

Travel Advisories: November 10-16, 2018

Interstate Highway Restrictions

I-95 logo    I-195 logo    I-295 logo

Temporary Exit Closures

  • Pawtucket: I-95 South at Exit 30, exit closed for bridge rehabilitation through mid-December. Follow signed detours.
  • Providence/East Providence: As part of ongoing repairs to the Washington Bridge Westbound, Exit 3 (Gano St.) off of I-195 West is closed through Fall 2019. Follow signed detour.

Ongoing Traffic Patterns

  • Providence: The previous traffic pattern with lane splits on I-95 North and South at Exit 19 has been modified, with all lanes now shifted to the left.
  • Providence/East Providence: I-195 West and East, from the Washington Bridge to the Mass. line, lane shifts in place.

See full list of Interstate Restrictions »

Other Limited Access Highway Restrictions

Rte 4 logo    Rte 10 logo    Rte 37 logo

Weekend

As part of the 6/10 Interchange Reconstruction Project, motorists can expect the following changes:

Sat., Nov. 10, from 8 p.m. to 7 a.m.:

  • Rte. 6 East at Broadway, exit closed for construction. Follow signed detour.
  • Rte. 10 North, from Union Ave. to the Tobey St. overpass, lane closures for traffic shifts to the temporary Rte. 10 North and temporary Westminster St. ramp
  • At the conclusion of this work, the Rte. 10 North shift and the Broadway exit closure will remain in place for approximately 24 months.

Sun., Nov. 11, from 8 p.m. to 7 a.m.:

  • Lane closures for traffic shifts to the right on Rte. 6 West, from the Tobey St. overpass to Hartford Ave.
  • One of two lanes on Westminster St. East, from Barton St. to Olneyville Square, will close
  • Traffic will shift on Broadway, from Barton St. to Olneyville Square
  • At the conclusion of this work, the traffic patterns will be place for approximately 12 months.

Next week, daytime work will resume behind barrier at the 6/10 Interchange on Tues., Nov. 13. Lane closures for construction are also possible Tues.-Fri. from 7 a.m. to 1 p.m. on Rte. 6 West, from the Tobey St. overpass to Hartford Ave.

See full list of Other Limited Access Highway Restrictions »

Metropolitan Providence

Rte 5 logo    rte 6 logo    Rte 15 logo

Weekend

  • Pawtucket: Pine St. at Marrin St., and Pine St. at Cedar St., alternating lane closure for fence installation, Sat. from 6 a.m. to 2 p.m.

Temporary Road Closure

  • Providence: Exchange St. North and South, from Memorial Blvd. to Stillman St., road closed for new traffic pattern installation, Wed. night from 10 p.m. to 5 a.m. Follow signed detour.

See full list of Metropolitan Providence Restrictions

East Bay

Rte 103 logo    rte 114 logo    Rte 136 logo

Weekend Road Closure

  • Barrington: Sowams Rd. North, from Lillis Ave. to Orchard Ave., road closed for drainage work, Sat. from 7 a.m. to 4 p.m. Follow signed detour.

Temporary Road Closure

  • Barrington: Nayatt Rd. East and West, from Middle Hwy. to Bay Rd., road closed to through traffic for pavement grinding and paving, Tues.-Fri. from 7 a.m. to 3:30 p.m. Follow signed detour. Please note: Motorists will experience a gravel driving surface prior to paving.

See full list of East Bay Restrictions »

Newport County

Rte 24 logo    Rte 77 logo    Ret 138 logo

Weekend

  • Portsmouth: Rte. 138 (East Main Rd.) East and West, from Turnpike Ave. to Boyds Lane, one lane open at all times for paving, Sat. from 7 a.m. to 3:30 p.m. Expect delays.

Temporary Road Closure

  • Portsmouth: Park Ave. East and West, from East Main Rd. to Narragansett Ave., is closed to through traffic for construction through mid-November. Follow signed detour.

See full list of Newport County Restrictions »

Northern R.I. & Blackstone Valley

Rte 100 logo    Rte 100 logo    Rte 100 logo

Overnight

  • Cumberland: Rte. 114 (Diamond Hill Rd.) North and South, from Industrial Rd. to Angell Rd., partial lane closures for pavement reclamation (grinding), Tues.-Thurs. nights from 6 p.m. to 6 a.m. Delays anticipated.

See full list of Northern R.I. & Blackstone Valley Restrictions »

South County

Rte 78 logo    Rte 108 logo    Rte 216 logo

New Traffic Pattern

  • Hopkinton: Motorists are experiencing an alternating one-way traffic pattern controlled by a temporary traffic signal for bridge work 24 hours per day on Mechanic St. North and South, under the I-95 overpass.
  • North Kingstown: Rte. 1A North and South, from West Min St. to Intrepid Dr., alternating one-way traffic in a moving operation for milling and paving, Tues. and Wed. nights from 8 p.m. to 6 a.m. Delays possible.

See full list of South County Restrictions »

West Bay

Rte 2 logo    Rte 33 logo    Rte 117 logo

Weekday

  • West Warwick: Pulaski St. East, from Pawtuxet Terrace to Manchester St., partial right lane and shoulder closures for a bridge inspection, Mon. from 8:30 a.m. to 4 p.m.

See full list of West Bay Restrictions »

Transit Service Alerts & News

Interstate Exits in Rhode Island

Did you know? Rhode Island has more than 68 miles of Interstate highway!

I-95 logo
Sequential

I-195 logo
Sequential

I-295 logo
Mile Marker Based