Top Live Traffic Cams

Find Traffic Cameras by Region


  • Camera at I-95 S @ Rt 10Exit 33 (Route 10)Live Stream
  • Camera at I-95 S @ Elmwood AveElmwood AvenueLive Stream
  • Camera at I-95 S @ Detroit AveDetroit AvenueLive Stream
  • Camera at I-95 N @ Thurbers AveThurbers AvenueLive Stream
  • Camera at I-95 N @ Public StPublic StreetLive Stream
  • Camera at I-95 S @ Broad St Broad StreetLive Stream

Travel Advisories: March 23-29, 2024

Interstate Highway Restrictions

I-95 logo    I-195 logo    I-295 logo

Washington Bridge, East Providence/Providence

  • East Providence/Providence: Bypass lanes for I-195 West traffic from East Providence to Providence are open. This temporary traffic pattern allows two lanes of travel westbound and two lanes of travel eastbound – all operating on the eastbound Washington Bridge. Expect delays.
  • East Providence/Providence: Exit 1D (Warren Ave.) off I-195 East, and the right shoulder from the I-way Bridge to the Potter St. overpass for drainage work, Mon. and. Tues. nights, 9 p.m.-5 a.m. Follow signed detour.

    Learn more

Overnight

  • Providence: I-195, from the Rt. 95/Rt.I-195 interchange to Potter St., alternating lane closures for a bridge inspection, Thurs. night, 10 p.m. – 5 a.m.
  • Cumberland: I-295 North, from the Blackstone River bridge to Exit 20, left lane closure for bridge construction Sun. – Wed. nights, 10 p.m. – 5 a.m.
  • Warwick: I-95 South between Exit 27A and 24B, and North, between Exit 24B and Exit 27, alternating lane closures for electrical work, Sun. – Thurs. nights, 7 p.m. – 3 a.m.

See full list of Interstate Restrictions »

Other Limited Access Highway Restrictions

Route 37 Improvements (Cranston/Warwick)

  • Cranston: I-295 North, from Rte. 37 to Phenix Ave., alternating lane closures for road construction, Sun. – Thurs. nights, 8 p.m. – 5 a.m.
  • Cranston: I-295 South at Rte. 37, alternating lane closures for bridge construction, Sun. – Thurs. nights, 8 p.m. – 5 a.m.
  • Cranston: Cranston St., between Sherman Ave. & Overbrook Dr., alternating one-way traffic with frequent vehicle access in/out of the work zone for bridge construction, Mon. – Fri., 6:30 a.m. – 2:30 p.m.

Weekday

  • Warwick: Rte. 37 at I-95 interchange & from Post Rd. at Rte. 37 interchange, use caution for a moving operation for survey work, Mon. & Tues., 10 a.m. – 2 p.m.

See full list of Other Limited Access Highway Restrictions »

Metropolitan Providence

Rte 5 logo    rte 6 logo    Rte 15 logo

Henderson Bridge

  • East Providence: Henderson Pkwy. West, at the off-ramp to Massasoit, ramp closed for construction. Follow signed detour.

Overnight

  • Providence: Gano St., from the India Point parking lot to Wickenden St., alternating lane closures for a bridge inspection, Wed. night, 10 p.m. – 5 a.m.
  • Providence: Waterfront Dr., from Warren Ave. to Taunton Ave., alternating lane closures for a bridge inspection, Thurs. night, 10 p.m. – 5 a.m. 

See full list of Metropolitan Providence Restrictions

East Bay

Rte 103 logo    rte 114 logo    Rte 136 logo

East Bay Bike Path Bridges

  • Barrington/Warren: Rte. 114, at the Barrington and Warren Bridges, the northbound boardwalks will remain open during demolition and construction of the bike path bridges, providing a continuous off-road path around the construction area.

See full list of East Bay Restrictions »

Newport County

Rte 24 logo    Rte 77 logo    Ret 138 logo

Newport Pell Bridge Approaches - Phase II

  • Newport: Starting Friday night, April 5 at 5 p.m. through Monday morning, April 8 at 7 a.m., extended weekend left lane closures are scheduled on both Route 138 East and West, between the Pell Bridge and JT Connell Highway overpass. This will allow us to remove and replace the center median.

See full list of Newport County Restrictions »

Northern R.I. & Blackstone Valley

Rte 100 logo    Rte 100 logo    Rte 100 logo

Weekday

  • Lincoln: Lower River Rd. over the Blackstone River, partial right lane closure for a bridge inspection, Tues., 8:30 a.m. – 3 p.m.
  • Woonsocket: Bernon St., from Truman Dr. to Front St., right lane closure for a bridge inspection, Fri., 8:30 a.m. – 3:30 p.m.
  • Woonsocket: Fairmount St., from River St. to First Ave., alternating lane closures for bridge inspection, Tues. & Fri., 9 a.m. – 3 p.m.
  • Woonsocket: Singleton St., from River St. to Harris Ave., expect narrowed lane and a partial right lane closure for a bridge inspection, Wed., 9 a.m. – 4 p.m.

See full list of Northern R.I. & Blackstone Valley Restrictions »

South County

Rte 78 logo    Rte 108 logo    Rte 216 logo

Weekday

  • Exeter: Ten Rod Rd at Stamp Pl., alternating lane closures for guardrail installation, Mon. – Fri., 10 a.m. – 3 p.m.
  • North Kingstown: Rte. 138, at the ramps from Rte. 1 (Tower Hill Rd.), drainage work behind barrier, Mon. – Fri., 7 a.m. – 3 p.m.
  • West Greenwich: Weaver Hill Rd., from Sharpe St. to Donald Potter Dr., alternating one-way traffic for guardrail installation, Mon. – Fri., 9 a.m. – 3 p.m.

See full list of South County Restrictions »

West Bay

Rte 2 logo    Rte 33 logo    Rte 117 logo

Airport Connector

  • Warwick: Jefferson Boulevard, from the Airport Connector on-ramp to the Airport Connector off-ramp, alternating lane closures for construction, Monday-Friday, 7 a.m.  – 3 p.m.
  • Warwick: Airport Connector from Jefferson Boulevard to TF Green Airport, left lane closures for construction, Monday-Friday, 7 a.m.  – 3 p.m.
  • Warwick: Post Rd., from Warwick Ave. to the TF Green Airport entrance on Post Rd., alternating lane closures for sidewalk work, Mon.-Fri., 9 a.m. – 3 p.m.

See full list of West Bay Restrictions »

Transit Service Alerts & News