Top Traffic Cams

Camera at I-95 at KinsleyI-95 at Kinsley

Camera at I-95 at Broad StI-95 at Broad St

Camera at I-95 at LonsdaleI-95 at Lonsdale

Camera at I-195 at WB SplitI-195 at Exit 2

Camera at I-195 Washington BridgeI-195 Washington Bridge

Camera at Rte 6 Dean StreetRte 6 at Dean Street

Find All Traffic Cameras by Region

Travel Advisories: May 30 - June 5, 2020

Interstate Highway Restrictions

I-95 logo    I-195 logo    I-295 logo

Centerville Road and Toll Gate Road Bridges (Warwick)

Centerville Road/I-95 North Bridge Replacement: May 28-June 2

I-95 (from Exit 10 to Exit 12)

  • Thurs. night, May 28 at 7 p.m.: Temporary median barrier placed on I-95 South
  • Fri. morning, May 29: Centerville Rd. West on-ramp to I-95 South closed; I-95 travel lanes reduced from four to three in each direction and shifted to the West
  • Fri. afternoon, May 29-Sun. morning, May 31: Existing I-95 North bridge spans demolished
  • Sun. morning, May 31-Mon. afternoon, June 1: New I-95 North bridge slid into place

Centerville Rd. (from Orchard Ave. to Commonwealth Ave.)

  • Fri. morning, May 29: Travel lanes reduced from two to one in each direction
  • Mon. night, June 1-Tues. morning, June 2: All travel lanes restored

Toll Gate Road/I-95 North Bridge Replacement: June 1-6

I-95 (from Exit 10 to Exit 12)

  • Tues. morning and night, June 2: Existing I-95 North bridge demolished
  • Wed. morning, June 3-Thurs. morning, June 4: New I-95 North bridge slid into place
  • Thurs. morning, June 4-Fri. morning, June 5: Bridges approaches completed; bridges prepared for traffic
  • Fri. morning, June 5-Sat. morning, June 6 by 6 a.m.: Barriers removed; striping placed; traffic restored to four lanes in each direction

Toll Gate Rd. (from Centerville Rd. to Leon Whipple Rd.)

  • Mon. night, June 1-Tues. morning, June 2: Traffic detoured
  • Thurs. morning, June 4 by 6 a.m.: Traffic restored


I-295/Rte. 6 Bridge Rehabilitation

I-295

  • I-295 North, from Scituate Ave. to Greenville Ave., alternating lane closures and temporary exit and ramp closures for milling, Sun.-Thurs. nights, 8 p.m.- 5 a.m. Follow signed detours. 
  • Closure of the southbound through lanes. Through traffic will utilize the new bridges on the service road.
  • Access will be maintained for ramps to Rte. 6 West to Hartford, Conn. (Exit 9C) and Rte. 6 East to Providence (Exit 9A).
  • The on-ramp from Hartford Ave./Rte. 6A West to I-295 South will remain closed.

Rte. 6 and Rte. 6A (Hartford Ave.)

  • Lane closed on the ramp from Rte. 6 West to I-295 North
  • Lane closures possible on both Rte. 6 and Rte. 6A at the I-295 overpasses
  • On-ramp closed from Rte. 6A West to I-295 South. Left turns permitted for nearby on-ramp normally used by Rte. 6A East traffic.

See full list of Interstate Restrictions »

Other Limited Access Highway Restrictions

Rte 4 logo    Rte 10 logo    Rte 37 logo

6/10 Interchange Project

Motorists can expect the following changes:

Rte. 6

  • Rte. 6, from Hartford Ave. to Rte. 10, alternating lane closures for construction, Tues.-Fri., 6:30 a.m.- 4 p.m.
  • Rte. 6 East, all traffic shifted onto the existing Rte. 6 West roadway just after the Hartford Ave. exit. Lanes are narrow.
  • The Broadway off ramp is closed.

Rte. 10

  • Rte. 10, from Tobey St.to Union Ave., alternating lane closures for construction, Tues.-Fri., 6:30 a.m.-4 p.m.

6/10 Connector

  • On Connector outbound a new lane split is in place for Rte. 10 South and Route 6 West, one-half mile before its original location. Lanes are narrow.

Affected City Streets

  • The Tobey Street on-ramp is closed. Follow detour signs.
  • Traffic shifted on the Broadway and Westminster St. bridges over the highway.
  • Westminster St. West at the Westminster St. Bridge, one lane closed for bridge work through 2021.

Project-wide

  • Periodic one-lane closures possible along Rte. 10 and Rte. 6 on off-peak hours Monday-Friday.

See full list of Other Limited Access Highway Restrictions »

Metropolitan Providence

Rte 5 logo    rte 6 logo    Rte 15 logo

Weekday

  • Cranston: Cranston St., from Sherman Ave. to Overbrook Dr., right lane closures for a bridge inspection, Fri., 9 a.m.- 3 p.m.
  • Cranston/Johnston: Rte. 14 (Plainfield Pike) East, from Sailor’s Way to the I-295 North on-ramp, and Rte. 14 West, from Simmonsville Ave. to the I-295 South on-ramp, alternating lane closures for bridge work, Mon.-Fri., 9 a.m.-3 p.m.
  • East Providence: Rte. 44 West, from Pawtucket Ave. to the MA line, alternating lane closures, shifts and narrowing possible for drainage work, Mon.-Fri., 7 a.m.-3:30 p.m. Driveway/walkway access restrictions also possible.
  • East Providence: Pawtucket Ave. at Pleasant St., lane closures, alternating and narrowed lanes possible in a moving operation for construction, Mon.-Fri., 7 a.m.- 4 p.m.

See full list of Metropolitan Providence Restrictions

East Bay

Rte 103 logo    rte 114 logo    Rte 136 logo

New Traffic Pattern

  • Bristol: Rte. 114 North, from Washington St. to the Silver Creek Bridge, northbound lane will be closed and detoured for bridge demolition through the end of August.

See full list of East Bay Restrictions »

Newport County

Rte 24 logo    Rte 77 logo    Ret 138 logo

Overnight

  • Little Compton: Meeting House Lane, from West Main Rd. to Commons Rd., alternating one-way traffic in a moving operation for striping, Sun. - Thurs. nights, 8 p.m.-6 a.m.

Weekday

  • Middletown: Coddington Hwy., from Lake Erie St. to JT Connell Hwy., partial lane closures for construction, Mon.-Fri., 8 a.m.-3:30 p.m.

See full list of Newport County Restrictions »

Northern R.I. & Blackstone Valley

Rte 100 logo    Rte 100 logo    Rte 100 logo

Weekday

  • Cumberland: Rte. 114 (Diamond Hill Rd.) at the intersection of Bear Hill Rd. and Angell Rd., alternating lane closures for construction, Mon.-Fri., 7 a.m.-3 p.m.
  • Cumberland: Rte. 122 (Mendon Rd.), from Heroux Blvd. to Bitmore Ave., alternating one-way traffic with partial lane closures and shifts possible in a moving operation for drainage work, Mon.-Fri., 8 a.m.-3 p.m. Frequent vehicle access in/out of work zone with driveway/walkway and parking restrictions.
  • Glocester: Rte. 44 (Putnam Pke.), from #648 to West Greenville Rd., lane shifts possible in a moving operation for construction, Mon.-Fri., 7 a.m.-3 p.m.
  • Lincoln: Rte. 116, just before and after the Rte. 146 on-ramps, alternating lane closures for bridge work, Mon.-Fri., 9 a.m.- 3 p.m.
  • North Smithfield: Old Great Rd. North, from Mechanic St. to Mountain Rd., right lane closed for utility work, Mon.-Fri., 7 a.m.- 3:30 p.m.

See full list of Northern R.I. & Blackstone Valley Restrictions »

South County

Rte 78 logo    Rte 108 logo    Rte 216 logo

Weekday

  • Richmond: Rte. 3, under the Baker Pines Bridge, shoulder closures for bridge work, Mon.-Fri., 7 a.m.-3:30 p.m.
  • Richmond: Rte. 138, at the Kingston Rd. Bridge, lane shifts in place for construction, Mon.-Fri., 7 a.m.-3:30 p.m.
  • South Kingstown: Old Tower Hill Rd., from Patton Ave. to Kelley Way, alternating lane closures, with shifts possible, for construction, Mon.-Fri., 6:30 a.m.- 3:30 p.m.

See full list of South County Restrictions »

West Bay

Rte 2 logo    Rte 33 logo    Rte 117 logo

New Traffic Pattern

  • Coventry: Alternating one-way traffic controlled by temporary traffic signals for bridge work, 24 hours per day on Rte. 33 (Sandy Bottom Rd.), over the Pawtuxet River at the Sandy Bottom Bridge, through December 2020. Access to local businesses maintained. Reduced lane widths. Expect delays.

See full list of West Bay Restrictions »

Transit Service Alerts & News

Interstate Exits in Rhode Island

Did you know? Rhode Island has more than 68 miles of Interstate highway!

I-95 logo
Sequential

I-195 logo
Sequential

I-295 logo
Mile Marker Based