Questions and Answers For:

Silver Creek Bike Path Culvert Bridge 2020-CB-056

Please Note: If this is the first time accessing our system on our new web site, you will be required to reset your password.

The ask question function is now disabled;
please call 14015634100 with any new questions.

Date Asked: 10/13/2021 Date Answered: 10/15/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Does the existing culvert have a weight capacity for equipment? or will separate access from the south end of the culvert need to be used?
Answer:
The existing culvert was designed for H-20 Loading and the current load rating indicates that the structure can satisfactorily carry this loading (20 Ton maximum). If the Contractor should propose to utilize any equipment to cross the structure that has loading that would exceed the H-20 axle loads, then they will be required to provide rating calculations to certify that the structure can support that loading. Otherwise, that equipment shall not be allowed to cross over the structure.
Date Asked: 10/13/2021 Date Answered: 10/15/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Will access be permitted through the private parking lot located at approximately 775 Hope Street adjacent to the job location?
Answer:
No access easements or rights of entry have been obtained for this project. The Contractor shall use the public rights of way or secure the necessary access agreements with private property owners per the Contract Documents.