Date Asked: 10/13/2021 | Date Answered: 10/15/2021 |
Poster: Anthony Mesiti | Company: Cardi Corporation |
Question:
Does the existing culvert have a weight capacity for equipment? or will separate access from the south end of the culvert need to be used? |
|
Answer:
The existing culvert was designed for H-20 Loading and the current load rating indicates that the structure can satisfactorily carry this loading (20 Ton maximum). If the Contractor should propose to utilize any equipment to cross the structure that has loading that would exceed the H-20 axle loads, then they will be required to provide rating calculations to certify that the structure can support that loading. Otherwise, that equipment shall not be allowed to cross over the structure. |
Date Asked: 10/13/2021 | Date Answered: 10/15/2021 |
Poster: Anthony Mesiti | Company: Cardi Corporation |
Question:
Will access be permitted through the private parking lot located at approximately 775 Hope Street adjacent to the job location? |
|
Answer:
No access easements or rights of entry have been obtained for this project. The Contractor shall use the public rights of way or secure the necessary access agreements with private property owners per the Contract Documents. |