Date Asked: 06/09/2021 Date Answered: 06/09/2021
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
I am having trouble with addendum #1 zip file. Please verify that the file can be loaded into Quest for bidding.
Answer:
We were able to import Addendum 1 Quest Lite Bid file into the Quest Lite Bidding software. You may want to try to delete the Addendum 0 bid file from your program first, then import the Addendum 1 file.
Date Asked: 06/08/2021 Date Answered: 06/09/2021
Poster: WAYNE CLARKE Company: cardi corp
Question:
Item Code 413, Rideability - Surface Course; This project is a 2 lane road, no full width shoulders and open to traffic during the surface course paving operation. Normally, RIDOT requires the transfer machine/trucks to be offset from the paver so they do not travel on the tack coat, but due to restrictions noted above, this project will require the transfer machine/trucks to travel over the tack coat. This comment is for information purposes.
Answer:
Code 413 Rideability-Surface Course shall be in accordance with the specification, as applicable.
Date Asked: 06/08/2021 Date Answered: 06/09/2021
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
Item #26 calls for full depth reclamation with calcium chloride. Plan sheet #9 - General Note #6 says calcium chloride shall not be used for dust control. Is there a conflict between these?
Answer:
There is not a conflict between Item 26 and Plan Sheet No. 9, General Note No. 6. The calcium chloride that is being used with the full-depth reclamation is for increasing stability and density, which yields a longer lasting base and roadway, and not for dust control.
Date Asked: 06/04/2021 Date Answered: 06/07/2021
Poster: WAYNE CLARKE Company: cardi corp
Question:
In addition to the high percentage concerns pertaining to the 'As Directed" quantities on Items 201.0414 & 701.0512, the contractor doesn't know if the work is at road crossings or on the shoulders. Road crossing work is much more expensive when the road is open to traffic as is the case on this project. At the least, the State should provide a quantities for road crossings and shoulders on both items.
Answer:
See answer below.
Date Asked: 06/04/2021 Date Answered: 06/07/2021
Poster: WAYNE CLARKE Company: cardi corp
Question:
Item Code 201.0414, Remove & Dispose Pipe - All Sizes; The bid quantity is 826 LF and the DOQ states there is 500 LF 'As Directed', the contractor has no idea on the number of runs, depth of runs and length of runs required for over 60% of the bid quantity. Please remove or greatly reduce the 'As Directed' quantity so fair pricing can be provided for this item.
Answer:
The "As Directed" amounts in the quantities for Item Code 701.0512 RCP Pipe M170 and Item Code 201.0414 Remove and Dispose Drainage Pipe will be deleted and a new pay item for "Drainage Repairs" with an Only Acceptable Bid will be added in a future Addendum.
Date Asked: 06/04/2021 Date Answered: 06/07/2021
Poster: WAYNE CLARKE Company: cardi corp
Question:
Item Code 701.0512, RCP Pipe M170, Class IV 12 Inch; The bid quantity is 816 LF and the DOQ states there is 500 LF 'As Directed', the contractor has no idea on the number of runs, depth of runs and length of runs required for over 60% of the bid quantity. Please remove or greatly reduce the 'As Directed' quantity so fair pricing can be provided for this item.
Answer:
The "As Directed" amounts in the quantities for Item Code 701.0512 RCP Pipe M170 and Item Code 201.0414 Remove and Dispose Drainage Pipe will be deleted and a new pay item for "Drainage Repairs" with an Only Acceptable Bid will be added in a future Addendum.
Date Asked: 06/01/2021 Date Answered: 06/07/2021
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
Please disregard my previous question - my mistake
Answer:
Noted
Date Asked: 06/01/2021 Date Answered: 06/07/2021
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
Quest already has bid pricing put in for the units - what's up?
Answer:
N/A