Date Asked: 10/20/2021 | Date Answered: 10/20/2021 |
Poster: Patricia Teeter | Company: Pare Corporation |
Question:
For the "Relevant Project Experience" section, may we provide individual project description sheets or do you only want a "listing" of our recent projects? |
|
Answer:
RIDOT would like to receive the individual project description sheets. |
Date Asked: 10/13/2021 | Date Answered: 10/19/2021 |
Poster: Seth Lemoine | Company: Collins Engineers |
Question:
On page 11 of the RFP for Current Workload, does RIDOT want to see company-wide contracts related to Bridge Engineering and Structural Design or only those that are associated with the personnel shown on the org. chart? |
|
Answer:
RIDOT would like to see at a minimum, for the Current Workload, the Bridge Engineering and Structural Design Projects associated with the personnel shown on the organizational chart. |
Date Asked: 10/12/2021 | Date Answered: 10/14/2021 |
Poster: Joseph Bambara | Company: CME/CHA |
Question:
On page 4 of the RFP, under Section A, Item 6, what types of applications does RIDOT anticipate the selected consultant to prepare? |
|
Answer:
Anticipated applications include but may not be limited to Grants, Permits, and any other related applications. |
Date Asked: 10/07/2021 | Date Answered: 10/12/2021 |
Poster: Patricia Teeter | Company: Pare Corporation |
Question:
There is a reference to a page limitation on Page 10 of 17, but no page limit is stated. Is there a page limit? |
|
Answer:
There is no page limit. |
Date Asked: 10/06/2021 | Date Answered: 10/06/2021 |
Poster: Joseph Giordano | Company: GRA, a division of GM2 |
Question:
Reference Item 16 on page 13. We would like to clarify that the 125% referenced in that paragraph applies only to a provisional ICR that may be necessary and does not mean that this is a cap for the selected consultants. Will consultants be able to use their audited ICRs for the fees? |
|
Answer:
Confirmed. There is no cap for Indirect Cost Rate. The 125% provisional rate will apply to firms without an approved ICR from the Office of Internal Audit or without a cognizant rate issued by another state. |