Date Asked: 04/05/2017 | Date Answered: 04/07/2017 |
Poster: Lee Taylor | Company: D'Ambra Const. Co., Inc. |
Question:
Please take another look at the 10% DBE requirement for this project. With this projects small quantities of items, usually performed by DBE subs, it will be very difficult to meet that goal. |
|
Answer:
RIDOT reviewed the Items of work in the contract and determined a 10% goal is realistic. |
Date Asked: 03/30/2017 | Date Answered: 04/07/2017 |
Poster: Lee Taylor | Company: D'Ambra Const. Co., Inc. |
Question:
The contractor is responsible to install the RIDEM Insignificant Alteration Permit sign (incidental to the project). Is this sign being furnished by RIDOT? |
|
Answer:
Installation of the RIDEM sign is incidental, as noted on CS-3 of the Contract Document. The RIDEM Permit (Terms and Conditions Note 8) requires a sign 12 inches wide and 18 inches long that identifies DEM and the application number. |
Date Asked: 03/30/2017 | Date Answered: 04/07/2017 |
Poster: Lee Taylor | Company: D'Ambra Const. Co., Inc. |
Question:
The work hours described on page CS-3 at the school properties only allow construction from 7:00 AM - 3:00 PM. Is it possible to extend that time until 3:30 PM in order to fill a complete 8 hour work day? |
|
Answer:
Addendum-2 will extend work hours to 3:30pm. |
Date Asked: 03/28/2017 | Date Answered: 03/30/2017 |
Poster: Joseph Godino | Company: John Rocchio Corporation |
Question:
Site 3 is not shown in the plans. Should the quantities for Site 3 be removed from the contract? |
|
Answer:
Addendum-1 will provide a third location in the Main Street parking lot, adjacent to the Saugatucket River |