define('RSS_READER_CACHE_ON', false); define('RSS_READER_CACHE_DIR', '/tmp/rsscache'); define('RSS_READER_CACHE_AGE', '3600'); define('CURL_PATH', '/usr/local/bin/curl'); ?>
195 East & West over the Washington Bridge is restricted to 48 tons (96,000 lbs.) and no oversize vehicles. Anticipated timeframe until fall 2026.
Route 146 North at the intersection of Sayles Hill Rd will be narrowed with lane splits for construction. Maximum vehicle width allowed is 10 ft. Anticipated timeframe is May 31, 2024 to August 31, 2024..
Exit ramp for 37B, C&D from 95 North is narrowed with barrier due to construction. Maximum vehicle width 9 ft. Anticipated timeframe April 23, 2021 until December 31, 2024.
The ramp from Route 6 East to I-95 North is narrowed with barrier due to construction. Max vehicle width 8 ft. 6 in. Anticipated timeframe April 23, 2021 until October 31, 2024.
Route 10 north and south at the 6/10 interchange narrowed due to construction. Max vehicle width 10 ft. Anticipated timeframe until October 31, 2024.
Route 37 east between Natick Ave and Exit 1C for New London Ave reduced to 11 ft. Maximum vehicle width 10 ft. 6 in. Anticipated timeframe May 03, 2023 until June 19, 2024.
Route 37 West between the I-95 North exit and the I-95 South exit reduced to 1 lane with barrier due to construction. Maximum vehicle width 9 ft. 6 in. Anticipated timeframe until July 5, 2024.
Exit ramp 3A from 295 South to Route 37 East narrowed with barrels due to construction. Max vehicle width 9 ft. 6 in. Anticipated timeframe until June 19, 2024.
Exit ramp 3A from 295 North to Route 37 East narrowed with barrels due to construction. Max vehicle width 9 ft. 6 in. Anticipated timeframe until June 19, 2024.
Route 99 North & South over Sayles Hill Rd has narrow lane splits with barrier due to construction. Maximum width of vehicles 8ft. 6in. Anticipated timeframe is until August 31, 2024.
The ramp for exit 10 to Route 146A North is narrowed with barrier due to construction. Maximum vehicle width is 11 ft. Anticipated timeframe until October 31, 2025.
The ramp from Route 146A South to 146 South is narrowed with barrier due to construction. Maximum vehicle width is 9 ft. Anticipated timeframe is until October 31, 2025.
The off ramp for exit 37B from I-95 south to Memorial Blvd is narrowed with barrier due to construction. Maximum vehicle width 10 ft. Anticipated timeframe until October 31, 2024.
The on-ramp from Memorial Blvd to 95 North is narrowed with barrier due to construction. Maximum vehicle width 12 ft. Anticipated timeframe until December 27, 2024.
The on-ramp from Memorial Blvd. to I-95 South is narrowed with barrier due to construction. Maximum vehicle width 10 ft. Anticipated timeframe April 23, 2021 until October 31, 2024.
Route 122 over I-295 is narrowed with barrier due to construction. Maximum vehicle width 10ft. Anticipated timeframe until December 31, 2024.
Allens Ave North & South has narrow lane splits with barriers due to construction Maximum vehicle width allowed is 10 ft. Anticipated timeframe is until August 1, 2024.
Route 102 North & South over Branch River has narrow lane splits with barriers for construction. No oversize vehicle is allowed. Maximum vehicle width allowed is 8 ft 6 in. Anticipated timeframe is until October 31, 2024.
US-44/Smith St. over I-95 is narrowed with barrier due to construction. Maximum vehicle width 9 ft. 6 in. Anticipated timeframe until June 29, 2024.
Providence Place under I-95 is narrowed with barrier due to construction. Maximum vehicle width is 10 ft. Anticipated timeframe is until December 28, 2024.
Route 98 at the Sucker Brook Bridge #103, between rt. 100 and Cross Rd. , has been narrowed to one lane alternating traffic. Maximum width of vehicles 10ft. 6in. Anticipated timeframe is April 30, 2026.