Questions and Answers For:

Improvements to US Route 1 (South Kingstown) 2017-CH-072

Please Note: If this is the first time accessing our system on our new web site, you will be required to reset your password.

The ask question function is now disabled;
please call 222-2492 X-4100 with any new questions.

Date Asked: 11/07/2017 Date Answered: 11/08/2017
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
Item #57 - Bituminous curbing Std. 7.5.0 is called out in the distribution of quantities at sta. 1000+00 to 1004.41 LT. I can not find those stations on my plan set. Is there another area apart from the main work that is not shown on the plans?
Answer:
The station range given refers to Zech Drive Alignment 2, which is shown on General Plan No. 5.
Date Asked: 11/07/2017 Date Answered: 11/08/2017
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
The assembly summary for Item #36 - Reconstruct Catch Basin/Vertical Walls calls for 4' of repair at all 54 locations of reconstruction of catch basin/corbel cones. Is the intent to use this item at all the locations? This item would not be used to repair a 1' vertical repair (no corbel repair) at a separate location? If a catch basin does not have a corbel there should be a minimum price per location to make a repair as the vertical price would not even cover the cost to take off the frame & grate.
Answer:
Vertical wall repairs will be made where necessary as determined by the Engineer. The unit of measurement is per Linear Foot. Corbel cone repairs will also be made where necessary as determined by the Engineer. The unit of measurement is per Each.
Date Asked: 11/03/2017 Date Answered: 11/06/2017
Poster: Thomas Miozzi Company: T. Miozzi, Inc.
Question:
It appears that the updated plans included in Addendum 1 are not uploaded correctly. Will an additional addendum be issued to correct this?
Answer:
This issue has been resolved. All plan sheets in Addendum 1 can be printed in proper fashion.
Date Asked: 10/11/2017 Date Answered: 10/12/2017
Poster: Joe Colapietro Company: Cardi Corporation
Question:
There is no intelligent compaction item.
Answer:
A bid Item will be provided in an upcoming addendum.
Date Asked: 10/11/2017 Date Answered: 10/12/2017
Poster: Joe Colapietro Company: Cardi Corporation
Question:
Please clarify the location of the Stone Swales and Grass Swales. Both are listed as cross limits on Route 1, but I cannot find anything showing a location on the plans.
Answer:
The locations of the proposed swales will be provided on the plans in an upcoming addendum.