Questions and Answers For:

Bridge Group 53 - Union Village RR 2018-CB-038

Please Note: If this is the first time accessing our system on our new web site, you will be required to reset your password.

The ask question function is now disabled;
please call 401-563-4100 with any new questions.

Date Asked: 03/24/2020
Poster: Colin O'Hearn Company: Atlantic Coast Dismantling, LLC
Question:
Are there any existing plans available?
Date Asked: 03/19/2020 Date Answered: 03/20/2020
Poster: Peter Calcagni Company: Manafort Brothers Inc
Question:
It appears that the bridge is shifting several ft away from the 12" water main. Does this water main need to be moved to allow it to be attached to the new parapet per detail? Or are you going to provide a different detail for supporting this watermain at the bridge?
Answer:
The existing wingwall supporting the existing water line is being retained.
Date Asked: 03/17/2020 Date Answered: 03/23/2020
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
Regarding Items #40/41, Please verify that a prime coat/blotter material are required at this project. This is a very seldom used technique at RIDOT projects.
Answer:
Prime coat/blotter material is not required for this RIDOT project.
Date Asked: 03/17/2020 Date Answered: 03/20/2020
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
Items #28,108,109, 128,137,and 139 usually are given minimum bid prices. Quest does not indicate this. Please confirm there are not minimum pricings at these items. Also, Item #1 in Quest indicates a lump sum bid price with no given bid amount or quantity, as described in the job specific specification.
Answer:
An addendum will be posted updating and/or adding minimum bid prices for some of these items, as deemed appropriate.
Date Asked: 03/17/2020 Date Answered: 03/20/2020
Poster: Lee Taylor Company: D'Ambra Const. Co., Inc.
Question:
Page JS-3 does not indicate the interim and substantial completion dates. Please provide.
Answer:
The dates are defined in the CS pages under “Notice to Contractor” (CS-12). Through an upcoming addendum the dates will be included in CS-13 (R1), JS-3 (R-1) and P-26 (R1) .