Date Asked: 04/02/2018 | Date Answered: 04/04/2018 |
Poster: WAYNE CLARKE | Company: cardi corp |
Question:
Code 202.9901, Handling, Hauling, Stockpiling, and Management of Contaminated Soils; On page JS-24, SECURITY; it states "the contractor is responsible for site security on a continuous basis. No trespassers are allow on site". How is this possible to keep trespassers off site when the contractor has to re-open the roadway to traffic per the TMP? Unless, this statement pertained to the stockpile location area, but none is shown on the contract documents. Please clarify. |
|
Answer:
The site security pertains to the stockpile area. Addendum No.4 clarifies the specification. |
Date Asked: 04/02/2018 | Date Answered: 04/04/2018 |
Poster: WAYNE CLARKE | Company: cardi corp |
Question:
Code 202.9901, Handling, Hauling, Stockpiling, and Management of Contaminated Soils; On page JS-21, first sentence, states the contractor is responsible for excavating, handling, hauling, unloading the soils to approved stockpile/testing locations, soil classification, segregation, soil characterization, management of the contaminated soils, and maintenance of the stockpiles....Please state the location of the stockpile area since there doesn't appear to be enough space within the Limits of Disturbance shown on the plans to stockpile the excavated materials. |
|
Answer:
The material may be stockpiled within the area adjacent to Terminal Road. Addendum No. 4 clarifies the stockpile area. |
Date Asked: 04/02/2018 | Date Answered: 04/04/2018 |
Poster: WAYNE CLARKE | Company: cardi corp |
Question:
What is the thickness of the existing asphalt on Allens Avenue? |
|
Answer:
The existing pavement structure cross-section consists of 1.75” to 4.66” (average 3.06”) of hot mix asphalt (HMA) on 4.5” to 16.25” of medium and coarse processed aggregate bases which are founded on silty sand subbases/subgrades. |