Questions and Answers For:

Girder Repairs to Louisquisset Pike Bridge 2021-CB-013

Please Note: If this is the first time accessing our system on our new web site, you will be required to reset your password.

The ask question function is now disabled;
please call 4015634100 with any new questions.

Date Asked: 05/06/2021 Date Answered: 05/07/2021
Poster: Anthony Mesiti Company: Cardi Corporation
Question:
Item 824.9925 - Please clarify how many brace diaphragms need to removed and replaced. Also clarify the location of the diaphragms.
Answer:
There are four cross braces as identified on plan sheet 6. Type 2 repairs require removal of cross brace to perform the weld repair and are identified as Type 2 (there are 3 locations at Bridge 074801 and 1 location at Bridge 074821). Repair Type 2A is similar to the Type 2 repair in that it’s a weld repair at in intermediate stiffener but with no cross brace.