Travel Advisories

May 4-10, 2024

Interstate Highway Restrictions

I-95 North Viaduct, Providence

Providence: I-95 North motorists are using a new traffic pattern after the Downtown exit and near Providence Place Mall with a newly relocated Exit 38, about one mile south of its former location. RIDOT has posted numerous signs to clearly guide motorists to their destinations. 

Providence: I-95 North, at Exit 38B (State Offices), exit closed for milling and paving, Fri. night (May 3), 10 p.m.-10 a.m. Sat. morning (May 4.) Follow signed detour.

Providence: On-ramps to I-95 North from Rte. 6 East and from Memorial Blvd. (Rte. 6 West) will be closed for traffic shift implementation, Fri. & Sat. nights (May 3 and 4), 10 p.m. – 6 a.m. Follow signed detours.

Providence: I-95, from Exit 37A to Exit 39A, alternating lane closures and a right lane shift at Exit 38 for traffic shift, Fri. & Sat. nights (May 3 and 4), 9 p.m. – 6 a.m. 

Providence: I-95 North at Exit 37 B,C,D interchange, right exit closed for pier repairs, Sun. – Thurs. nights, 11 p.m. – 6 a.m. Follow signed detour.

Providence: I-95, from Exit 37A to Exit 39A, alternating lane closures for median barrier installation, Sun. – Thurs. nights, 9 p.m. – 6 a.m.

Learn more about the project


Washington Bridge, East Providence/Providence

New Traffic Pattern: Bypass lanes for I-195 West traffic from East Providence to Providence are open. This temporary traffic pattern allows three lanes of travel eastbound and three lanes of travel westbound – all operating on the eastbound Washington Bridge. Expect delays.

Providence/East Providence: I-195, from South Main St. to Broadway, alternating lane closures for striping, Sun.-Thurs. nights, 9 p.m. – 5 a.m.

Learn more


New Traffic Pattern

Cumberland: I-295, over Rte. 122 (Mendon Rd.), at the Mendon Rd. Bridge, travel lanes reduced from three to two for bridge work through late 2024.

Temporary Ramp Closure

Pawtucket: On-ramp from Fountain St. to I-95 North will be closed for survey work, Sun. – Wed. nights, 9 p.m. – 5 a.m. Follow signed detour.

Overnight

East Providence/Barrington: I-195, from the Mass. line to I-95 South, various lanes closed with frequent vehicle access in/out of the work zones in a moving operation for sweeping, Mon. night, 9:30 p.m.-3 a.m. Expect delays.

Hopkinton: I-95 South, from Exit 1 to the Connecticut line, alternating lane closures for road construction, Sun. – Fri. (May 10) nights, 6 p.m. – 6 a.m.

Providence/Cranston: I-95 North, from Broad St. overpass to Exit 35, right lane closed for drainage work, Wed. night, 9:30 p.m.-4 a.m.

Providence/Cranston: I-95 North, from Broad St. overpass to Exit 35, left lane closed for drainage work, Mon. night, 9 p.m.-7 a.m.

Providence: I-95 South, from Exit 36A to Exit 36B, and on the Eddy St. off-ramp (Exit 36B), alternating lane closures for bridge power washing, Sun.-Thurs. nights, 9 p.m.-4 a.m.

Smithfield: I-295 North, under Rte. 7 overpass, alternating lane closures for a bridge inspection, Thurs. night, 9 p.m. – 4 a.m.

Smithfield:  I-295, between Rte. 7 overpass & Rte. 146 Exit 18B, alternating lane closures for bridge work, Sun. – Thurs. nights, 9 p.m. – 5 a.m.

Weekday

Providence/Cranston: I-95 North, from Broad St. overpass to Exit 35 (Thurbers Ave.), right lane closed for drainage work, Tues., 9:30 a.m.-2:30 p.m.

Providence/Cranston: I-95 South, from Exit 35 to the Broad St. overpass, left lane closed for drainage work, Mon., 9 a.m.-2:30 p.m.

  All schedules are weather-dependent and subject to change. Back to top


Other Limited Access Highway Restrictions

Reconstruction of Route 146 (Lincoln/North Smithfield)

Lincoln: The on-ramp from Rte. 146 South to I-295 North will be closed for bridge work through the fall. Follow signed detour.

Lincoln: Exit 18A off I-295 South, plus the Rte. 246 South Service Rd., from Exit 8B to Exit 7B, closed for bridge demolition, Sun. night, 9 p.m. – 5 a.m. Follow signed detour.

Lincoln: Exit 18B off I-295 North closed for bridge work, Sun. – Thurs. nights, 9 p.m. – 5 a.m. Follow signed detour.

Lincoln: Exit 18B off I-295 South, Exit 8B off Rte. 146 North, and the Rte. 146 North Service Rd., from Exit 8A to Exit 8C, closed for bridge work, Mon.-Thurs. nights, 9 p.m. – 5 a.m. Follow signed detour.

Lincoln: Rte. 146, from Exit 7 to Exit 8C, extended rolling roadblocks for bridge work, Mon.-Thurs. nights, midnight-6 a.m. through Fri. morning (May 17.) Please follow signed detours.

Lincoln: I-295, from Exit 18A to Exit 18B, alternating lane closures for bridge work, Sun. (May 5) – Wed. (May 15) nights, 9 p.m. – 6 a.m.

Lincoln: Rte. 146 North, from Exit 8A to 8C, road closed for bridge demolition, Sun. night, 9 p.m. – 6 a.m. Traffic will be detoured to service roads.

Lincoln: Rte. 146, from Exit 8A to Exit 8C, alternating lane closures for bridge work, Sun. – Wed. nights, 9 p.m. – 6 a.m.

Lincoln/North Smithfield: Rte. 146, from Rte. 99 (Exit 8C) to Rte. 146 split, alternating lane closures for road construction, Sun. – Wed. nights, 9 p.m. – 6 a.m.

North Smithfield: No left turns allowed at Rte. 146 & Sayles Hill Rd. intersection for bridge work, Mon. – Wed. nights, 9 p.m. – 6 a.m. Follow signed detour. 

North Smithfield: Rte. 146, from Rte. 146A to the Mass. line, alternating lane closures for road construction, Mon. – Fri., 7 a.m. – 3 p.m.

North Smithfield: Sayles Hill Rd. East, from Rte. 146 to Rte. 99, alternating lane closures for drainage installation, Mon. – Fri., 7 a.m. – 3 p.m.

North Smithfield: Sayles Hill Rd. West, from Iron Mine Hill Rd. to Rte. 146, alternating lane closures for drainage installation, Mon. – Fri., 7 a.m. – 2 p.m.

North Smithfield: Travel lanes have shifted at the Rte. 146/Rte. 146A (Exit 10) interchange, with the following changes:

  • Rte. 146 North: both travel lanes have shifted to the right
  • Rte. 146 North, at Exit 10 (Rte. 146A): ramp narrows at the exit from two lanes to one
  • Rte. 146A South, at the off-ramp to Rte. 146 South: travel lanes are narrow

Learn more about the project


Route 37 Improvements (Cranston/Warwick)

Cranston: Rte. 37 East, from Pontiac Ave. to I-95 ramps, alternating lane closures for various construction operations, Sun. – Thurs. nights, 9 p.m. – 5 a.m.

Cranston: Pontiac Ave., from Rte. 37 West off-ramps to Rte. 37 East on-ramps, alternating lane closures for drainage work, Mon. – Fri., 9 a.m. – 3 p.m.

Cranston: Cranston St., from Sherman Ave. to Overbrook Dr., alternating one-way traffic for bridge construction, Mon. & Fri., 6 a.m. – 2 p.m.

Learn more about the project


6/10 Interchange Project (Providence)

Route 10

  • Rte. 10 North, from Union Ave. to Tobey St., alternating lane closures for landscaping work, Mon. – Fri., 6:30 a.m. – 2:30 p.m.
  • Rte. 10 South, all lanes shift to the left near the Broadway overpass.
  • Westminster Street off-ramp is temporarily closed.

Route 6

  • Rte. 6 East, from Plainfield St. to Flyover Bridge, alternating lane closures for paving, Sun. night, 8 p.m. – 5 a.m.
  • Plainfield St. at the Rte. 6 overpass, alternating lane closures for curb & sidewalk work, Mon. – Fri., 6:30 a.m. – 2:30 p.m. 

6/10 Connector

  • On the Connector outbound a new lane split is in place for Rte. 10 South and Rte. 6 West, several hundred feet south of its previous location. Lanes are narrow.

Affected City Streets

  • The Tobey St. and Harris Ave. on-ramps are closed. Follow signed detours.
  • Traffic shifted on the Broadway and Westminster St. bridges over the highway.
  • Westminster St. on-ramp to Rte. 10 South is closed. Follow signed detour.

Project-wide

  • Periodic one-lane closures possible along Rte. 10 and Rte. 6 on off-peak hours, Mon. – Fri.

Learn more about the project


Temporary Ramp Closures

Lincoln: The on-ramps from Breakneck Hill Rd. to Rte. 146 remain closed for bridge work until further notice. Follow signed detour.

New Traffic Pattern

Providence: All traffic on Rte. 146 South under the Hawkins St. Bridge has shifted to the left through early May, then will shift to the right until the end of June.

Overnight

Providence-Lincoln: Rte. 146, from Exit 7 (Rte. 116) to I-95, right lane and temporary ramp closures in a moving operation for sweeping and litter removal, Mon. night, 9 p.m.-7 a.m.

Weekday

Cranston/Warwick: Alternating lane closures in a moving operation for survey work on the following roads, Mon. – Fri., 9 a.m. – 3 p.m.: Rte. 37, from I-295 to Rte. 1 (Post Rd.); Rte. 2 (New London Ave.) at Rte. 37; and Rte. 1 (Post Rd.), from Maple St. to Lincoln Ave.

Cranston/Warwick: Shoulder closures in a moving operation for survey work on the following roads, Mon. – Fri., 9 a.m. – 3 p.m.: Rte. 5 (Oaklawn Ave.) at Rte. 37; Glen Hills Rd. at Rte. 37; Power Rd. at Rte. 37

Lincoln: Rte. 146 South at Breakneck Hill Rd. bridge, left lane closure for median barrier work, Mon., 4 a.m. – 7 a.m.

Providence/North Providence/Lincoln: Rte. 146, from I-95 to I-295, right shoulder closure for sign work, Mon. – Fri., 9 a.m. – 3 p.m.

South Kingstown: Rte. 1 North, from Exit 1A to Salt Pond Rd., alternating lane closures for highway signage inspection, Mon. – Fri., 9 a.m. – 4 p.m. (Mon. May 13 – Fri., May 17)

Westerly/Charlestown/South Kingstown: Rte. 1 North, from Wagner Rd. to Salt Pond Rd., alternating lane closures for highway signage inspection, Mon. – Fri., 9 a.m. – 4 p.m. 

Westerly: Rte. 1, from Bellaire St. to East Ave., alternating lane closures for sidewalk work, Mon. – Fri., 9 a.m. – 3 p.m.

  All schedules are weather-dependent and subject to change. Back to top


Metropolitan Providence

Henderson Bridge (East Providence, Providence)

East Providence: Henderson Pkwy. West, at the off-ramp to Massasoit, ramp closed for construction. Follow signed detour.

East Providence: East River St./River Dr., from Waterman St. to Angell St., road closed for bridge demolition, Mon. – Fri., 7 a.m. – 3 p.m. Follow signed detour.

East Providence: Henderson Pkwy., from the roundabout to the Henderson Bridge, alternating lane closures for drainage and curbing work, Mon.-Fri., 9 a.m.-3 p.m.

East Providence: Waterfront Dr., from Waterman Ave. to the roundabout, lane narrowing for drainage and curbing work, Mon. – Fri., 9 a.m. – 3 p.m.

Learn more about the project


Temporary Bridge Closure

Johnston/North Providence: The Greystone Sluiceway Bridge on Greystone Ave. over the Woonasquatucket River, between Riverside Ave. in Johnston and Rte. 104 (Waterman Ave.) in North Providence, is closed. Follow signed detour using Waterman Ave. and Rte. 44 (Putnam Pke.)

Weekday

North Providence: Rte. 15, from Charles St. to Woodward Rd., alternating lane closures for a bridge inspection, 9 a.m. – 3 p.m.

Providence: Rte. 1, from Massachusetts Ave. to Indiana Ave., right shoulder closure for sidewalk work, Mon. – Fri., 7 a.m. – 3 p.m.

Providence: Allens Ave., from Henderson St. to Globe St., right lane closure for road work, Mon. – Fri., 6 a.m. – 6 p.m. This operation will be active from April 22 – May 17.

Continuing

Pawtucket: The Barton St. Bridge, between Broad St. and Montgomery St., is currently closed. Get Detour Maps »

Providence: Visit the City of Providence’s online calendar for traffic restrictions.

Additional lane closures for this region
may be listed under Other Limited Access Highways

  All schedules are weather-dependent and subject to change. Back to top


East Bay

East Bay Bike Path Bridges

Barrington/Warren: Rte. 114, at the Barrington and Warren Bridges, the northbound boardwalks will remain open during demolition and construction of the bike path bridges, providing a continuous off-road path around the construction area.

Additional lane closures for this region
may be listed under Other Limited Access Highways

  All schedules are weather-dependent and subject to change. Back to top


Newport County

Newport Pell Bridge Approaches - Phase II

Newport: Route 138 East, up to Admiral Kalbfus Rd., including the roundabout and JT Connell Highway toward Van Zandt and America’s Cup avenues, and Route 138 West back toward the Pell Bridge, alternating lane closures for milling & paving, Sun. – Thurs. nights, 8 p.m. – 6 a.m. through May 24.

Newport: Minimal traffic impacts are expected during daytime operations including maintenance of drainage swales, installation of loam and seed sitewide, and miscellaneous work on the newly installed traffic cabinets and lighting signals.

Learn more about the project


Weekday

Middletown: Rte. 138 (Aquidneck Ave.), at #28, alternating one-way traffic for wheelchair ramp installation, Mon. – Fri., 9 a.m. – 3 p.m.

Portsmouth/Middletown: East Main Rd. South, from Turnpike Ave. to Valley Rd., right lane closed with driveways/walkways blocked in a moving operation for mowing, Mon., 8 a.m.-3 p.m.

Additional lane closures for this region
may be listed under Other Limited Access Highways

  All schedules are weather-dependent and subject to change. Back to top


Northern R.I. & Blackstone Valley

New Traffic Pattern

Burrillville: Rte. 102, between Rte. 107 (East Ave.) and Central St., all traffic is shifting to the southbound side of the bridge through late June.

Cumberland: Rte. 122 (Mendon Rd.), from Rte. 116 (George Washington Hwy.) to Albion Rd., right lane closed/shifted with frequent vehicle access in/out of work zone for bridge work, through May 2024.

Overnight

Cumberland: Rte. 122 (Mendon Rd.) just before and after #1646, alternating one-way traffic for drainage work, Sun. – Thurs. nights, 9 p.m. – 5 a.m.

Weekday

Burrillville: Reservoir Rd. North, at #450, partial right lane closure with narrowed lanes and frequent vehicle access in/out of the work zone in a moving operation for drainage work, Mon. and Tues. 8:30 a.m.-2:30 p.m.

Chepachet: Rte. 44, at Martin Lot Cemetery, a lane shift will be in place for retaining wall work, Mon. – Fri., 9 a.m. – 3 p.m.

Foster: Partial right lane closures and narrowed lanes in a moving operation for pavement repair at the following locations, Tues., 8:30 a.m.-2:30 p.m.: Rte. 94 (Mt. Hygeia Rd.), from Rte. 6 to Rte. 101 and Central Pke., from Round Hill Rd. to Rte. 94

Glocester: Rte. 44, from West Greenville Rd. to Spring Grove Rd., partial right lane closures and narrowed lanes in a moving operation for mowing, Wed. and Thurs., 8:30 a.m.-2:30 p.m.

Glocester: Rte. 44, from #648 to West Greenville Rd., partial right lane closures and narrowed lanes in a moving operation for mowing, Tues., 8:30 a.m.-2:30 p.m.

Lincoln: Rte. 116 (George Washington Hwy.), from #550 to Mendon Rd., various lane closures in a moving operation for sweeping, Wed., 8:30 a.m.-3 p.m.

North Smithfield: Right shoulder closures with narrowed lanes in a moving operation for sidewalk sweeping on the following roads, Mon., 8:30 a.m.-2:30 p.m.: Rte. 146A, from Rte. 5 to Rte. 104, and Rte. 102, from South Main St. to Rte. 5.

North Smithfield/Burrillville: Rte. 7, from North Smithfield/Burrillville line to Smithfield line, motorists should use caution as crews will be conducting drainage work in a moving operation, Mon. – Fri., 9 a.m. – 3 p.m. Right lanes may be closed as needed.

Scituate/Glocester: Rte. 116 North, from Rte. 6 to Snake Hill Rd. in Glocester, partial right lane closures and narrowed lanes in a moving operation for mowing, Wed., 8:30 a.m.-2:30 p.m.

Scituate: Rte. 116, from West Greenville Rd. to Rte. 6, partial right lane closures and narrowed lanes in a moving operation for mowing, Tues., 8:30 a.m.-2:30 p.m.

Scituate: Rockland Rd. North, from Rte. 102 to Westcott Rd., partial right lane closure with narrowed lanes and frequent vehicle access in/out of the work zone in a moving operation for drainage work, Mon., 8:30 a.m.-2:30 p.m.

Smithfield: Rte. 7, from Rte. 116 to Providence Pk., right lane closure for guardrail work, Mon. – Fri., 9 a.m. – 3 p.m.

Woonsocket: Rte. 122 (Mendon Rd.), at Newbury Ave., alternating lane closures & right lane shift for gas main installation, Mon. & Tues., 9 a.m. – 3 p.m. 

Woonsocket: Mendon Rd., from Cumberland Hill Rd. to Diamond Hill Rd., alternating shoulder closures in a moving operation for drainage & sidewalk work, Mon. – Fri., 9 a.m. – 3 p.m.

Additional lane closures for this region
may be listed under Other Limited Access Highways

  All schedules are weather-dependent and subject to change. Back to top


South County

Overnight

North Kingstown: Rte. 138, at the ramps from Rte. 1 (Tower Hill Rd.), temporary lane shift will be in place for barrier & striping work, Fri. night. (May 10), 9 p.m. – 6 a.m.

West Greenwich: Nooseneck Hill Rd. bridge (Rte. 3) at I-95, alternating lane closures for power washing & painting, Sun. – Thurs. nights, 8 p.m. – 4 a.m.

West Greenwich: Rte. 102 at Victory Hwy. bridge, alternating lane closures for bridge power washing & painting, Sun. – Thurs. nights, 8 p.m. – 5 a.m.

Weekday

Exeter: Ten Rod Rd., from Plain Rd. to South Rd., alternating lane closures for guardrail work, Mon. – Fri., 9 a.m. – 3 p.m.

Hopkinton: Off-road drainage inspections taking place at the following locations, Mon. – Fri., 8 a.m. – 3 p.m.: High St. (Rte. 216), from Maple Ct. to Main St., Potter Hill Rd., from Chistian Hill Rd. to Laurel St., Maxson St., from Laurel St. to Main St., Laurel St., Potter Hill Rd. to High St. 

North Kingstown: Tower Hill Rd., from West Allenton Rd. to Hamilton Allenton Rd., alternating one-way traffic for wheelchair ramp & electrical work, Mon. – Fri., 9 a.m. – 3 p.m.

North Kingstown: Rte. 138, at the ramps from Rte. 1 (Tower Hill Rd.), frequent vehicle access in/out of the work zones with ramp narrowing for electrical work and drainage work behind barrier, Mon. – Fri., 6:30 a.m. – 3 p.m.

Richmond: Rte. 138 at Richmond Town House Rd. & Carolina Nooseneck Rd. intersection, alternating lane closures with narrowed lanes for curb installation, Mon. – Fri., 7 a.m. – 3 p.m.

Additional lane closures for this region
may be listed under Other Limited Access Highways

  All schedules are weather-dependent and subject to change. Back to top


West Bay

Airport Connector (Warwick)

Warwick: Airport Connector, from I-95 North to Post Rd., right shoulder closure for landscaping, Mon. – Fri., 7 a.m. – 3 p.m.

Warwick: Post Rd., from Warwick Ave. to the TF Green Airport entrance, alternating lane closures for sidewalk work, Mon – Fri., 9 a.m. – 3 p.m.

Learn More About This Project


Weekday

Warwick: Rte. 117 (West Shore Rd.), at Warwick Ave., alternating lane closures with lanes narrowed and shifted for curb, sidewalk, & electrical work, Mon. – Fri., 9 a.m. – 3 p.m.

Warwick: Rte. 117 (Centerville Rd.), from Dunmore Rd. to I-95, alternating lane closures in a moving operation with frequent vehicle access in/out of the work zone for utility work, weekdays, 5 a.m. – 3 p.m. through the end of May.


Additional lane closures for this region
may be listed under Other Limited Access Highways

  All schedules are weather-dependent and subject to change. Back to top


Subscribe to this Report

Receive email notification when we change this page.

Sign Up Today!