Top Live Traffic Cams

Find Traffic Cameras by Region


  • Camera at I-95 S @ Rt 10Exit 33 (Route 10)Live Stream
  • Camera at I-95 S @ Elmwood AveElmwood AvenueLive Stream
  • Camera at I-95 S @ Detroit AveDetroit AvenueLive Stream
  • Camera at I-95 N @ Thurbers AveThurbers AvenueLive Stream
  • Camera at I-95 N @ Public StPublic StreetLive Stream
  • Camera at I-95 S @ Broad St Broad StreetLive Stream

Travel Advisories: March 16-22, 2024

Interstate Highway Restrictions

I-95 logo    I-195 logo    I-295 logo

Washington Bridge, East Providence/Providence

  • East Providence/Providence: Bypass lanes for I-195 West traffic from East Providence to Providence are now open. This temporary traffic pattern will allow two lanes of travel westbound and two lanes of travel eastbound – all operating on the eastbound Washington Bridge.

    Learn more

Overnight

  • Cumberland: I-295 North, from the Blackstone River bridge to Exit 20, left lane closure for steel beam placement, Sun. – Thurs. nights, 10 p.m. – 5 a.m.
  • Cumberland: I-295, at Mendon Rd., expect temporary delays for steel placement, Sun. – Thurs. nights, 10 p.m. – 5 a.m.
  • Johnston/Cranston/Warwick: I-295 South, from Exit 8 to Exit 1, use caution and expect various lane closures in a moving operation to inspect highway signage, Tues. night, 9 p.m. – 3 a.m.
  • Warwick: I-95 South between Exit 27A and 24B, and North, between Exit 24B and Exit 27, alternating lane closures for electrical work, Sun. – Thurs. nights, 9 p.m. – 6 a.m.

See full list of Interstate Restrictions »

Other Limited Access Highway Restrictions

Route 37 Improvements (Cranston/Warwick)

  • Cranston: I-295 North at Rte. 37, alternating lane closures for bridge construction, Sun. – Thurs. nights, 8 p.m. – 5 a.m.
  • Cranston: I-295 South at Rte. 37, short-term rolling roadblocks and right lane closures for steel beam placement, Wed. & Thurs. nights, 8 p.m. – 5 a.m.
  • Cranston: I-295, at Rte. 37, use caution for bridge beam deliveries, with vehicles frequently entering and exiting work zone, Mon., 10 a.m. – 3 p.m. 
  • Cranston: Cranston St., between Sherman Ave. & Overbrook Dr., alternating one-way traffic with frequent vehicle access in/out of the work zone for bridge construction, Mon. – Fri., 6:30 a.m. – 2:30 p.m.  

See full list of Other Limited Access Highway Restrictions »

Metropolitan Providence

Rte 5 logo    rte 6 logo    Rte 15 logo

Henderson Bridge

  • East Providence: Henderson Pkwy. West, at the off-ramp to Massasoit, ramp closed for construction. Follow signed detour.

Weekday

  • Pawtucket: Central Ave., from Benefit St. to Olive Ave., alternating lane closures for a bridge inspection, Tues., 9 a.m. – 3 p.m.
  • Pawtucket: Weeden St., from Lockbridge St. to Moshassuck River, alternating lane closures for a bridge inspection, Tues. & Wed., 9 a.m. – 4 p.m.  

See full list of Metropolitan Providence Restrictions

East Bay

Rte 103 logo    rte 114 logo    Rte 136 logo

East Bay Bike Path Bridges

  • Barrington/Warren: Rte. 114, at the Barrington and Warren Bridges, the northbound boardwalks will remain open during demolition and construction of the bike path bridges, providing a continuous off-road path around the construction area.

See full list of East Bay Restrictions »

Newport County

Rte 24 logo    Rte 77 logo    Ret 138 logo

Newport Pell Bridge Approaches - Phase II

  • Newport: Rte. 138 East, from the Pell Bridge to the JT Connell Connector, right lane closures for landscaping, Mon. – Fri., 9 a.m. – 3 p.m.
  • Newport: JT Connell Highway, from Van Zandt Ave. to JT Connell Connector, expect shoulder work for drainage and curb installation work, Mon. – Fri., 7 a.m. – 3:30 p.m.

See full list of Newport County Restrictions »

Northern R.I. & Blackstone Valley

Rte 100 logo    Rte 100 logo    Rte 100 logo

Weekday

  • Cumberland: Rte. 122, at Rte. 114, expect various shoulder closures in a moving operation for drainage work, Mon. – Fri., 9 a.m. – 3 p.m.
  • Woonsocket: Singleton St., from River St. to Harris Ave., partial right lane closure for a bridge inspection, Thurs., 9 a.m. – 4 p.m.   

See full list of Northern R.I. & Blackstone Valley Restrictions »

South County

Rte 78 logo    Rte 108 logo    Rte 216 logo

Weekday

  • North Kingstown: Rte. 138, at the ramps from Rte. 1 (Tower Hill Rd.), drainage work behind barrier, Mon. – Fri., 7 a.m. – 3 p.m.

See full list of South County Restrictions »

West Bay

Rte 2 logo    Rte 33 logo    Rte 117 logo

Airport Connector

  • Warwick: West Shore Rd., from Airport Rd./Warwick Ave. to Delwood Rd., alternating lane closures for sidewalk work, Mon.- Fri., 9 a.m. – 3 p.m.
  • Warwick: Post Rd., from Warwick Ave. to the TF Green Airport entrance on Post Rd., alternating lane closures for sidewalk work, Mon-Fri., 9 a.m. – 3 p.m.

See full list of West Bay Restrictions »

Transit Service Alerts & News