Top Live Traffic Cams

• Beta Testing

Find Traffic Cameras by Region


  • Camera at I-95 S @ Rt 10Exit 33 (Route 10)Live Stream
  • Camera at I-95 S @ Elmwood AveElmwood AvenueLive Stream
  • Camera at I-95 S @ Detroit AveDetroit AvenueLive Stream
  • Camera at I-95 N @ Thurbers AveThurbers AvenueLive Stream
  • Camera at I-95 N @ Public StPublic StreetLive Stream
  • Camera at I-95 S @ Broad St Broad StreetLive Stream

Travel Advisories: September 23-29, 2023

Interstate Highway Restrictions

I-95 logo    I-195 logo    I-295 logo

I-95 North Viaduct, Providence

  • Providence: I-95 North, after the Downtown Providence exit (Exit 37/old Exit 22), use caution when traveling through the area, motorists traveling North on I-95 should stay in the LEFT lanes, those traveling to Rt. 146 North should stay in the CENTER lane to access new bridge ramp, only state offices exit traffic should be in the RIGHT lane.
  • Providence: I-95, at the Exit 37 interchange, temporary ramp closures possible for construction, Sun.-Thurs. nights, 11 p.m.-6 a.m. Follow signed detours.
  • Providence: I-95 North, at the on-ramp from Atwells Ave., on-ramp closed for bridge work, Sun.- Thurs. nights, 11 p.m.-6 a.m. Follow signed detour.

Weekend

  • Cumberland: I-295 South, from Diamond Hill Rd. to the Blackstone River Bridge, and I-295 North, from Blackstone River Bridge to Exit 20 (Diamond Hill Rd.), various shoulder closures for a new lane shift, Fri. night, 9 p.m.-5 a.m.
  • Cumberland: I-295 at Exit 20 (Rte. 122), travel lanes will be reduced from three lanes to two in each direction for work on the Mendon Road Bridge, Friday, Sept. 29.

Overnight

  • Cranston: I-95 Exit 33 (A&B) to Rte. 10 North and South, ramps closed for construction Sunday & Monday nights from 9 p.m. to 5 a.m. Follow signed detours.

See full list of Interstate Restrictions »

Other Limited Access Highway Restrictions

Reconstruction of Route 146 (Lincoln/North Smithfield)

  • Lincoln: I-295, between the Rte. 7 and Rte. 122 interchanges over Rte. 146, travel lanes have shifted to the right and have reduced from three to two.
  • Lincoln: At the Rte. 146 South service roads, from Rte. 116 to Rte. 99, alternating lane closures for construction, Sun.-Thurs. nights, 9 p.m.- 6 a.m.

Route 37 Improvements (Cranston/Warwick)

  • Cranston: I-95 South, at Exit 31A (Rte. 37 West on-ramp), one of the two lanes is closed.
  • Cranston: A new lane shift is in place on Rte. 37 near the I-295 interchange. Reduce your speed, stay in your lane.
  • Cranston: Rte. 37 West, from Exit 2B (I-95 North) to Exit 1E (Pontiac Ave.), travel lanes reduced from two to one.

Overnight

  • Cranston: Rte. 10 North and South to I-95 North, ramps closed for construction Tuesday & Wednesday nights from 9 p.m. to 5 a.m. Follow signed detours.

See full list of Other Limited Access Highway Restrictions »

Metropolitan Providence

Rte 5 logo    rte 6 logo    Rte 15 logo

Overnight

  • North Providence: Charles St. and Mineral Spring Ave., before and after the Mineral Spring Ave. Bridge and Charles St. Bridge, alternating one-way traffic for bridge work, Sun.-Thurs. nights, 9 p.m.- 6 a.m.

Weekday

  • East Providence: Rte. 114A (Pleasant St), from the intersection of Pleasant St. and Hunts Mill Rd. to the intersection of Fall River Ave. and Ledge Rd., narrowed lanes /one way traffic for milling and paving, Mon.-Fri., 7 a.m.- 3:30 p.m.

See full list of Metropolitan Providence Restrictions

East Bay

Rte 103 logo    rte 114 logo    Rte 136 logo

East Bay Bike Path Bridges

  • Barrington/Warren: Rte. 114, at the Barrington and Warren Bridges, the northbound boardwalks will remain open during demolition and construction of the bike path bridges, providing a continuous off-road path around the construction area.

Overnight

  • East Providence: Rte. 152 North and South, at the intersection of North Broadway and Roger Williams Ave. (before and after the bridge) alternating lane closures for milling and temporarily striping, Mon. night 9 p.m.-6 a.m.

See full list of East Bay Restrictions »

Newport County

Rte 24 logo    Rte 77 logo    Ret 138 logo

Newport Pell Bridge Approaches - Phase II

  • Newport: Temporary Lane shifts and frequent construction vehicles entering and exiting work zones for Drainage and electrical Work along JT Connell with traffic personnel and traffic officers assisting. Mon.-Fri 7 a.m.-3 p.m.
  • Newport: Admiral Kalbfus – Frequent construction entering and exiting work zone for paving operations with traffic personnel and traffic officers assisting.

Weekday

  • Middletown: Aquidneck Ave., from East Main Rd. to Green End Ave., alternating one-way traffic for construction, Mon.- Fri., 8:30 a.m.-3:30 p.m.

See full list of Newport County Restrictions »

Northern R.I. & Blackstone Valley

Rte 100 logo    Rte 100 logo    Rte 100 logo

Temporary Road Closure

  • Burrillville: Rte. 7 North and South, between Victory Hwy. and Rte. 102, road closed for bridge work at the Nasonville Concrete Arch Bridge, until December. Follow signed detour.

Weekday

  • Lincoln: School St., from Kennedy Blvd. to Main St. Albion/Briarwood Rd., alternating lane closures for construction, Mon.-Wed. 9 a.m.-3 p.m.
  • Woonsocket: Mendon Rd., from Cumberland Hill Rd. to Diamond Hill Rd., various shoulder closures in a moving operation with frequent vehicle access in/out of work zone and possible blocked driveways/walkways for sidewalk work, Mon.-Fri. 9 a.m.-3 p.m.

See full list of Northern R.I. & Blackstone Valley Restrictions »

South County

Rte 78 logo    Rte 108 logo    Rte 216 logo

Temporary Road Closure

  • Charlestown/Richmond: Kings Factory Rd., at the Kings Factory Rd. Bridge over the Pawcatuck River just south of Rte. 91, is closed for bridge replacement through the end of the year. Follow signed detour.
  • Richmond: Richmond Town House Rd., from Rte. 138 to Cardinal Lane, road closed for construction Mon.-Fri., 7 a.m.-3 p.m. Follow signed detour.

Weekday

  • Narragansett: Rte. 1A Boston Neck Rd. North and South, from Conanicus Rd. to Sprague Bridge., various shoulder closures for micromilling and striping, Mon.-Fri. 7 a.m.-7 p.m.
  • Richmond: Rte. 138 East, at the intersection of Richmond Townhouse Rd. and Nooseneck Rd., right shoulder closed for drainage work, Mon.-Fri. 7 a.m.-3 p.m.

See full list of South County Restrictions »

West Bay

Rte 2 logo    Rte 33 logo    Rte 117 logo

Airport Connector (Warwick)

  • Warwick: Airport Connector, from RI TF Green International Airport to I-95, right lane closures for landscaping, painting, and a bridge demolition, Mon.-Fri., 6:30 a.m.-3 p.m.
  • Warwick: Post Rd., from Warwick Ave. to the Airport entrance, various partial lane closures for sidewalk construction, Mon.-Fri., 9 a.m.-3 p.m.

Weekday

  • Cranston: Rte. 5, from New London Ave. to Fairway Dr., alternating lane closures for a bridge inspection, Tues.-Wed.-Thurs. 9 a.m.-3 p.m.
  • Warwick: on Rte. 115 Toll Gate Rd. below I-95, partial right lane closed with narrowed lanes, possible driveways/walkways blocked for a bride inspection, Mon. and Tues. 9 a.m.-4 p.m.

See full list of West Bay Restrictions »

Transit Service Alerts & News