This project includes full pavement replacement, sidewalks, traffic signals and stormwater drainage upgrades at various locations In Tiverton and Little Compton. No new signals are being installed on the project.
The areas to be improved are:
![]() |
Alternating lane closures will be needed for sign work along Route 77 (Main Road), from Central Avenue to Bridgeport Road, Tuesday through Friday from 9 a.m. to 3 p.m. Project wide landscaping and removal of existing traffic signal equipment on Main Road at Highland Road has been completed, while retaining wall installation at the back of the sidewalk and drainage work is scheduled along Main Road and Highland Road, respectively. |